Barn Adj To Forge Cottage White HIll Cromer Stevenage SG2 7QA
Discharge of condition 3 (Materials of construction) 4 (Landscaping) 6 (Climate change) of planning approval 3/23/1080/FUL
Prestwick Ermine Street Buntingford Hertfordshire SG9 9RT
Discharge of condition 4 (Construction Management Plan) of planning approval 3/21/3089/FUL
Home Farm Munden Road Dane End Ware Hertfordshire SG12 0LL
Discharge conditions 3 (lighting details), 6 (materials), 7 (hard surfacing), 13 (Construction Management Plan), 25 (electric vehicle charging points) and 26 (high speed broadband internet connection) attached to 3/19/2211/FUL
Land At Gosmore Paddock Benington Hertfordshire SG2 7DD
Discharge of conditions 5 (Levels) and 7 (Construction Management Plan) attached to 3/23/0950/VAR.
Pump Hill Cottage Pump Hill Brent Pelham Buntingford Hertfordshire SG9 0HQ
Discharge condition 3 (external materials of construction) attached to 3/21/2985/HH
Land Adjacent To 1 Coltsfoot Lane Datchworth Hertfordshire SG3 6SB
Discharge appeal conditions 3 (vehicular access), 4 (external materials of construction), 5 (ground levels), 7 (No external lighting), 8 (landscaping), 11 (electric vehicle charging point), 15 (obscured glazing windows) attached to 3/21/2474/FUL (Allowed on appeal APP/J1915/W/22/3294678).
Land At Gosmore Paddock Benington Hertfordshire SG2 7DD
Discharge appeal conditions 6 (ground levels) and 8 (Construction Management Plan) attached to 3/17/1145/OUT (allowed on appeal APP/J1915/W/17/3184877).
7 St Marys Lane Hertingfordbury Hertford Hertfordshire SG14 2LD
Discharge of conditions 3 (Means of enclosure), 4 (Climate Change), 6 (Materials of construction), 7 (Landscape design proposals), 8 (new window) and 9 (new doors) attached to 3/21/2251/FUL.
Home Farm Chapel Lane Little Hadham Ware Hertfordshire SG11 2AB
Discharge of condition 6 (Construction) 8 (Landscape) for planning approval 3/22/1430/LBC
Gates Of Hertford Gascoyne Way Hertford Hertfordshire SG13 8EL
Discharge of conditions 7 (broadband) 8 (Noise) 12 (Drainage) 18 (EV) 19 (EV) 20 (Boilers) 21 (Boilers) 22 (Water) 27 (EV) 28 (EV) 29 (Highways) 33 (Cycles) 34 (Cycles) for planning approval 3/22/0112/VAR Broadband Acoustic Insulation wall build up details Phase II site investigation EVCPs Boilers Water Consumption Calculations Footpath construction details Cycle Parking Loading Bay