49A Streetsbrook Road Solihull B90 3PB
Discharge condition Nos. 5-Landscaping, 6-Landscaping, 8-Levels, 9-Ecology-bats, 10-CMP, 11-Drainage, 12-Boundary Treatments, 13-Trees, 14-Tree Barriers, 15-Trees and 16-Trees on planning approval PL/2021/00193/MINFDW- Demolish the existing building and replace it with a new building.
Land North Of Orchard House The Avenue Medburn Northumberland
Discharge of conditions : 4 (surface water), 8 (floor levels, 10 (ecology), 12 (tree/hedges), 13 (landscape), 14 (boundary treatment), 16 (car/cycle parking), 18 (construction method statement) and 21 (levels) pursuant to planning approval 18/02939/OUT
Land West Of Lancaster Park Pinewood Drive Lancaster Park Morpeth Northumberland
Discharge of Conditions 4 (boundary treatment), 6 (car parking area), 12 (street maintenance), 14 (cycle parking),15 (surface water drainage), 18 (construction method statement), 19 (refuse storage), 23 (mitigation measures), 25 (tree protection), 27 (landscaping), 31 (flood risk assessment) and 37 (acoustic design scheme) in relation to 16/00078/OUT
Burnside Lodge Eastgate Bank Mickley Stocksfield Northumberland NE43 7LY
Discharge of conditions 3 (external materials and boundary treatments), 4 (energy efficiency), 5 (tree protection plan), 6 (hard and soft landscaping), 7 (construction method statement), 8 (vehicular access), 11 (ecological report), 13 (land contamination) , 14 (contamination verification), 16 (ground gas protective measures) in relation to approved application 20/04441/FUL (Amended Description 06/05/2022).
Fairholme Stables Archers Green Lane Tewin Hertfordshire AL6 0JF
Discharge conditions 10 (details of landscaping), 11 (details of boundary walls, fences, means of enclosure), 15 (details of habitat boxes/structure) and 18 (trees and hedges protected) attached to 3/20/0810/FUL.
790A Green Lanes London N21 3RE
Details pursuant to ref: 20/00369/FUL: CMP (3), Materials (4), Energy Statement (5), Landscaping (6), Biodiversity Enhancements (7), Potable Water (10), Boundary Treatments (11), SuDS (12), Tree Protection (14), Piling (15), Tree Protection Monitoring (16), Surfacing Materials (18), Cycle Parking (19), M4 (20) for Sub-division of site and erection of a 2-storey block of 2 x 1 bed self-contained flats.
1A London End Irchester Wellingborough Northamptonshire NN29 7BH
Details submitted pursuant to conditions 3 (details of external materials), 4 (details of screen walls/fences and boundary treatments), 5 (details of levels), 6 (details of landscaping/protection of trees/hedgerows), 7 (National Accessibility Standards in category 2 (accessible and adaptable dwellings) and 10 (WSI - archaeology) of planning permission reference WP/20/00057/FUL
156 Town Lane Benington Stevenage Hertfordshire SG2 7BT
Discharge conditions 2 (levels), 3 (boundary walls and fences), 5 (access) 6 (visibility splays), 7 (gates), 8 (parking spaces), 9 (hard surfacing and drainage) and 11 (tree and hedge protection) attached to 3/18/1614/FUL
Tresham Institute Of Further And Higher Education Church Street Wellingborough Northamptonshire NN8 4PD
Details submitted pursuant to conditions 3 (materials surfacing, lighting, CCTV, access, security), 4 (soft landscaping works), 5 (as 3), 6 (crime prevention measures), 8 (boundary treatements), 9 (protection of trees and hedgerows), 10 (parking areas), 11 (existing access), 12 (proposed bicycle parking) of planning permission reference WP/19/00559/VAR
Land At Giggety Lane And Ounsdale Road Wombourne South Staffordshire WV5 0AY
Discharge of Conditions - 18/00831/FUL Condition 4 - Tree Protective Barriers Condition 6 - Boundary Treatment Condition 7 - Details of the proposed external lighting Condition 9 - Materials Condition 10 - Details of the access connections to the Staffordshire and Worcestershire canal towpath Condition 12 - Details for root protected areas Condition 13 - Construction and Environmental Management Plan Condition 14 - Tier 3 level controlled waters risk assessment Condition 19 - Traffic Management Scheme Condition 20 - Drainage Condition 23 - Warstones Brook Condition 24 - Remediation strategy