The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details trees, shrubs and hedgerows pursuant to condition 4 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details of car parking spaces pursuant to condition 6 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details of sound limiting insulation pursuant to condition 8 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
The Poplars 2 Lilian Board Way Greenford UB6 0SB
Details of cycle storage spaces pursuant to condition 18 of planning permission ref: PP/2014/6582 dated 20/01/2016 for: Redevelopment and single and two storey extensions of C2 hostel, increasing existing building footprint by 327sqm and gross internal floor space by 1,566sqm. Development works to include: formation of Community Hub (Class D2); construction of a second storey; internal configuration; formation of additional 28 self-contained units (total 60 self-contained units and 217 beds up from 85 beds), vehicle and cycle parking, refuse and recycling store, boundary fencing, walling and landscape enhancements (Regulation 3 - Council's own development)
Land Adjacent To 7 Robert Wallace Close And The Heights Galloway Road Bishops Stortford Hertfordshire CM23 2TG
Discharge conditions 2 (appearance, landscaping, layout and scale), 4 (ground levels), 5 (Construction Management Plan), 6 (external materials of construction), 7 (high-speed broadband internet), 8 (integrated bat/bird cavity box), 9 (water consumption), 10 (minimising overheating in summer, reduce need for heating in winter), 13 (electric vehicle charging point), 14 (cycle parking facilities), 15 (refuse storage) and 16 (boundary walls, fences) attached to 3/21/2124/OUT.
Russett House School, 11, Autumn Close, Enfield, EN1 4JA
Details of phasing of construction, materials, surfacing, levels, enclosure, parking/turning, energy statement, drainage design, landscaping scheme, refuse storage and existing lighting submitted pursuant to conditions 02, 03, 04, 05, 06, 07, 09, 11, 12, 14 & 16 of approval under Ref:LBE/11/0010 for part single, part 2-storey extension to provide a classroom block, dining room and kitchen with a plant room at first floor level, pick up and drop off bay at front, relocation of fence to southern boundary between Russett House School and Carterhatch School and new car parking area and associated landscaping and formation of a Multi Use Games Area (MUGA) with 8m high lighting columns to Carterhatch School playing fields.
Land Comprising Field At 431305 464500 Station Lane Burton Leonard North Yorkshire
Application for approval of details required under Condition 4 (Landscaping) and Condition 8 (Biodiversity Net Gain, Biodiversity Management Plan, Landscape Mitigation Plan) of planning permission 22/00777/FUL (Proposed Battery Storage System and associated infrastructure including transformers, switch rooms, cabin, storage container, CCTV, boundary fence and access gates and formation of new access).
Abbey Farm Alby Common Alby Norwich Norfolk NR11 7HG
Discharge of conditions 3 (details of car parking spaces, materials of all screen walls and fences) & 5 (landscaping) of planning permission PF/15/1310 (Variation of Conditions 3 and 4 of planning permission 07/0536 to permit 1, 2A, 3B and 3 as residential dwellings)
Queen Elizabeth Stadium, Donkey Lane, Enfield, EN1 3PL
Details of refuse storage, fume extraction, landscaping, turnstile railings, secure players entrance cage, siting, location and attachment of CCTV, noise monitoring and mitigation, survey of railings, brickwork, concrete and render (repairs and new works), precaution measures of protection and securitysubmitted pursuant to condition 2, 3, 7, 8, 9, 10, 11, 12, 15 & 16 of approval granted under ref: LBC/09/0026 for external works of repair to pavilion building comprising alterations to internal layout, installation of new services and fittings, installation of new finishes to floors and walls, external access ramps, lift, replacement glazing, replacement roof covering and replacement high level railings, extractor flue to roof at first floor level, south elevation, together with installation of turnstile to side, caged enclosure with 1.83m mesh infill panelled fencing and pedestrian access gates on north elevation leading from pavilion and pvc sleeved post and rail perimeter fencing (1.1m high) with mesh infill panels to sports field, covered and open standing terraces, 4 additional lighting columns (up to 20m high), two prefabricated dugouts, alterations to junction with Carterhatch Lane, widening of Donkey Lane, provision of car parking bays to Donkey Lane, provision of pedestrian footway, laying out of car and coach parking to south of pavilion.
Queen Elizabeth Stadium, Donkey Lane, Enfield, EN1 3PL
Details submitted to LBC/09/0026 for Areas of landscaping to the north, east and west sides of the pavilion submitted pursuant to condition 6 for external works of repair to pavilion building comprising alterations to internal layout, installation of new services and fittings, installation of new finishes to floors and walls, external access ramps, lift, replacement glazing, replacement roof covering and replacement high level railings, extractor flue to roof at first floor level, south elevation, together with installation of turnstile to side, caged enclosure with 1.83m mesh infill panelled fencing and pedestrian access gates on north elevation leading from pavilion and pvc sleeved post and rail perimeter fencing (1.1m high) with mesh infill panels to sports field, covered and open standing terraces, 4 additional lighting columns (up to 20m high), two prefabricated dugouts, alterations to junction with Carterhatch Lane, widening of Donkey Lane, provision of car parking bays to Donkey Lane, provision of pedestrian footway, laying out of car and coach parking to south of pavilion.