Cinram Logistics Ltd Rabans Lane Aylesbury Buckinghamshire HP19 8TS
Application for the partial discharge of condition 14 and 41 (construction transport management plan) for the purposes of demolition and site clearance only required by planning ref: 23/02399/VRC
Land Adjacent Sir Henry Lee Crescent Berryfields Aylesbury
Discharge of Conditions 6(Landscape) 8(Ecological) & 14(Construction traffic management plan) relating to application 18/02680/APP
East West Rail Phase 2
Submission of details for Approval in Principle relating to discharge of condtion 9 - Code of Construction Practice ahead of the formal Transport and Works Act for East West Rail Phase 2.
East West Rail Line Buckingham Road Winslow Buckinghamshire
Addendum to discharge of condition reference 20/56410/EWRDIS relating specifically to the submission of details pursuant to condition 15 A Construction Traffic Management Plan (CTMP) for Highways Development Stages at B2-J-2 (Steeple Claydon) and B2-P-12 (Verney Junction) relating to the planning direction received from the Department for transport referenced TWA/18/APP/04 for East West Rail Phase 2
Land At Buckingham Road Winslow Buckinghamshire
Discharge of condition 5 (Construction Traffic Management Plan) for 18/04244/ADP
Haddenham And Thame Parkway Station Thame Road Haddenham Buckinghamshire
Submission of detail pursuant to Conditions : 5 - Phasing discharge; 7 - Samples of the materials proposed to be used on the external surfaces; 8 - Details of both hard and soft landscape works; 10 - Tree Protection Plan (TPP) and Arboricultural Method Statement (AMS) in accordance with BS5837 detailing how trees and hedgerow fronting Thame Road to be retained are to be protected; 11- Slab levels; 12 - Details of the facilities to be provided for the storage and collection of refuse; 16- Scheme for parking, garaging and manoeuvring; 17 - Accommodate all site operatives', visitors' and construction vehicles loading, off-loading, parking and turning within the site during the construction period; 18 - Adequate precautions taken during the construction period to prevent the deposit of mud and similar debris on the adjacent public highways; 19 - Detailed surface water drainage scheme and an assessment of the hydrological and hydrogeological context of the development in any phase; 20 - Scheme to deal with the risks associated with contamination of the site and 21 - Verification report demonstrating completion of the works set out in the approved remediation strategy and the effectiveness of the remediation on outline permission 10/00009/AOP
Land Adjacent Aston Clinton Road Weston Turville Buckinghamshire
Discharge of Condition 29 (Construction Vehicle Tracking) relating to application 15/03806/AOP