Former Lawrence Automotive Site Sayer Drive Coventry CV5 9PF
Submission of details to discharge condition No. 14 (Noise and Vibration Management Plans); imposed on planning permission reference S73/2022/0165 granted on 06/05/2022 for Variation of Condition 2 (drawing Numbers) on planning permission FUL/2020/2794 for Construction of an industrial unit (General Industrial (Class B2) and/or Storage and Distribution (Class B8) use) with ancillary offices, access, servicing, parking, drainage and landscaping. Construction of HGV trailer parking for adjacent unit (Class B8) with pre-check offices, lighting, drainage and landscaping; and all other ancillary works approved on 12/11/2021 - to amend height of building, addition of a door to gatehouse, and relocation of HGV turning circle, erection of single storey plant room with plant on the roof, installation of first floor mezzanine, HVAC installation, additional windows, installation of silos, water treatment plant, smoking shelter, new automatic barrier and other external alterations.
Paragon Park Phase 5 Foleshill Road Coventry CV6 5AY
Submission of details to discharge condition No. 35 Construction Environmental Management Plan (CEMP); imposed on planning permission reference S73/2018/2999 granted on 17.04.2019, of original permission for Variation of conditions 5, 7, 33 and 39 (to amend details of acoustic bund and alignment of spine road) imposed on planning permission S73/2015/3068 for submission of details to vary condition 7 (to allow occupation of dwellings within Phase 1 prior to the acoustic bund being installed) imposed upon planning permission OUT/2014/2538 granted on 2nd March 2015 for Hybrid Planning Application for the erection of up to 700 dwellings and provision of up to 3500 sq.m of employment floorspace (B1, B2, B8), remodelled public park, new playing field for primary school, public open space, attenuation areas, pedestrian routes including canalside path, means of access to Foleshill Road and Stoney Stanton Road and creation of noise barriers adjacent to the EMR premises.
Garage at Land Adjacent 183 Fletchamstead Highway Coventry CV4 7AR Coventry
Submission of details to discharge condition: 10 - Gas Protection imposed on planning permission S73/2021/1426 - Variation of conditions 2 (approved plans); 3 (Construction Management Plan); 4 (Materials) and 8 (Hard and Soft Landscaping) imposed on planning permission FUL/2020/0009 for the Demolition of existing garages and development of a bungalow with parking and landscaping approved on 20/03/2020 to allow for the re-siting of the bungalow to be set back within the site, installation of photovoltaic panels on rear roof slope, electric vehicle charging point, and the erection of a shed in rear garden. The details submitted for consideration include: Construction Management Plan, Materials schedule and hard and soft landscaping details (external works) approved on 5/7/2021 .
Jaguar Land Rover Abbey Road Coventry CV3 4LF
Submission of details to discharge condition 11 (Travel Plan), imposed on application reference S73/2018/2125, granted on 22nd October 2018 (Variation of FUL/2016/2648) for the erection of Powertrain development facility including office, design, engineering and vehicle testing space, site car parking, a welcome centre, fuel farm building, an electricity substation and alterations to the existing mileage accumulation facility, including construction and associated works
Phase 5 Paragon Park Foleshill Road Coventry West Midlands CV6 5AY COVENTRY
Discharge of Conditions 12 (Contractors Environmental Management Plan), 28 (Construction Method Statement) and Condition 35 (Construction Environmental Management Plan) imposed on S73/2018/2999 Variation of conditions 5, 7, 33 and 39 (to amend details of acoustic bund and alignment of spine road) imposed on planning permission S73/2015/3068 for submission of details to vary condition 7 (to allow occupation of dwellings within Phase 1 prior to the acoustic bund being installed) imposed upon planning permission OUT/2014/2538 granted on 2nd March 2015 for Hybrid Planning Application for the erection of up to 700 dwellings and provision of up to 3500 sq.m of employment floorspace (B1, B2, B8), remodelled public park, new playing field for primary school, public open space, attenuation areas, pedestrian routes including Canalside path, means of access to Foleshill Road and Stoney Stanton Road and creation of noise barriers adjacent to the EMR premises granted on 17/04/2019
Harper Road Coventry CV1 2AP Coventry
Submission of details to discharge condition 7-Construction Management Plan: omposed on planning permission S73/2019/2242 for Variation of condition 2 - Drawing numbers - (Minor alterations to internal entrance foyer to provide 2No. additional bedrooms - increase in bedspaces from 266No. to 268No. No external alterations proposed), pursuant to planning permission reference FUL/2017/2239 for the Demolition of existing Dairy Crest Distribution Depot with the erection of a three to six-storey student residential building containing 50 cluster flats totalling 266 student bedrooms with associated amenity space, communal facilities, bicycle parking and landscaping, determined by planning committee on 15/02/2018 (decision dispatched on 23/02/2018).
Sandy Lane Business Park, Unit 3 Sandy Lane Coventry CV1 4DQ
Discharge of Condition No.7 (Construction & Environmental Mangament Plan) imposed on S73/2020/0917 Variation of Condition 2 imposed under Application FUL/2018/1927 Proposed change of use to creative production hub, extensions and external alterations and rebuilding of unit 3 granted on 28/02/2019 (Minor material amendment to Unit 3 to reduce building height by 1no. storey, retention of existing brickwork to front, and erection of inset pod at first floor level, removal of second floor accommodation within unit 4, relocation and enlargement of central storey entrance lobby extension, reduction of polycarbonate facades, general rearrangement of internal layout to both units including alterations to external fenestration, removal of solar panels on Unit 3 and alterations to roof lights on Unit 4. Drawings have also been updated to suit correct survey information.) granted on 10/07/2020.