Land East Of 33 The Holmes Littleport Cambridgeshire
To discharge Conditions 4 (Re-location of the WWII spigot mortar base), 6 (Energy and Sustainability Strategy), 7 (CEMP), 8 (Foul & Surface Water), 10 (External Materials), 11 (Hard Landscaping), 12 (Boundary Treatments), 15 (Piling) and 20 (Soft Landscaping) of decision 21/00297/FUL dated 22 December 2021 for Construction of 9no. open market dwellings with associated vehicular access
5 New Road Littleport Cambridgeshire CB6 1PX
To discharge Conditions 5 (foul and surface water) 9 (soft landscaping) 10 (boundary treatment) of decision 20/01458/FUL dated 20 April for construction of 1no. three bedroom two storey detached dwelling
59 Ditton Green Woodditton Cambridgeshire CB8 9SQ
To discharge conditions 3 (site characterisation), 4 (sample materials), 5 (soft landscaping), 11 (arboricultural method statement), 13 (boundary treatments), 14 (biodiversity improvements and 16 (outbuilding plans) of decision dated 02/05/2023 for 22/00722/FUL for the demolition of existing dwelling, and construction of 2no. new dwellings
Land To The West Of Thatched Cottage The Green Woodditton Road Kirtling Suffolk
To discharge Conditions 8 (soft landscaping) 9 (boundary treatments) 13 (biodiversity improvements scheme) of decision 23/00140/FUL dated 12 May 2023 for Construction of two storey three bedroom detached dwelling and garage (part-retrospective)
The Granary Whitegate Farm Witcham Road Mepal Ely Cambridgeshire CB6 2AF
To discharge Condition 3 (Contamination), 5 (Foul & Surface Water), 8 (Hard landscaping), 9 (Boundary Treatments), and 11 (Material Schedule) of decision dated 25.11.2020 for 20/01134/FUL Construction of two detached single storey dwellings previously part of application 19/01634/OUT
36 West End Haddenham Ely Cambridgeshire CB6 3TE
To discharge condition numbers 3 (Archaeology), 4 (Surface Water And Foul Water Disposal Scheme), 5 (Contamination), 7 (External Materials), 8 (Reptile Survey and Mitigation Strategy) , 14 (Boundary Treatments), 15 (Hard Landscaping)of Decision dated 15.01.2021 for Construction of 2no. four bedroom, two storey detached dwellings each with a garage
Land To East Of Orchard Cottage 11 Chapel Lane Reach Cambridge CB25 0JJ
To discharge conditions 3 (Contamination), 5 (Archaeology), 6 (Surface and Foul Water Disposal Scheme), 7 (Construction Environmental Management Plan), 8 (Piling and Mitigation Measures), 9 (Construction Times and Deliveries), 10 (Brickwork Sample Panel), 11 (External Roofing Materials), 12 (Doors, Windows, Roof lights, Lintels/Sills and Rainwater Goods), 13 (Boundary Treatments), 14 (Soft Landscape Works Schedule), 18 (Biodiversity) on Decision dated 3.9.2020 for Construction of one and half storey detached dwelling with new access
Car Park Hill Side Mill Quarry Lane Swaffham Bulbeck
To discharge Conditions 3 (Surface water drainage), 9 (Hard landscape), and 10 (Boundary) of decision dated 21/04/2022 for 21/01611/VARM Variation of Condition 1 (approved plans) 20 (external brickwork) and 21 (external materials and fenestration) of previously approved 19/01721/VAR To vary condition 1 (approved plans) of previously approved 17/01231/FUM for construction of 19 dwellings with associated parking and amenity space and retention of existing offices on site
Land Between 53 And 61 Silver Street Burwell Ely CB25 0EF
To discharge condition numbers 6 (Soft Landscaping Schedule), 8 (Visibility Splays), 10 (Biodiversity Enhancements) and 11 (Boundary Treatments) of Decision dated 8.9.2021 for Construction of four bedroom, 2 storey dwelling with brick shed and associated parking, gates and wall to the front - previously approved on 20/1170/FUL
22 Link Lane Sutton Ely Cambridgeshire CB6 2NF
To discharge condition numbers 4 (Detailed Design and Construction Method Statement), 5 (Soft Landscaping), 6 (Boundary Treatments) and 11 (Electric Vehicle Charging Point) of Decision dated 8.8.22 for erection 1 no. dwelling