Alma Estate EN3
Details submitted pursuant to reference 19/03624/VAR: servicing and delivery plan (57) Phase 2A and 4 in submission of planning application under Section 73 to amend conditions 2 (approved drawings), 3 (phasing plan), 7 (residential units), 8 (non-residential floorspace) and 52 (car parking provision) of outline planning permission 15/02039/OUT, as amended by 17/04670/VAR, to facilitate minor changes to residential unit numbers from 993 to 1,080, building heights, development zones, non residential floorspace, landscaping and play provision and parking provision in relation to Phases 2A and 4 of the Alma Estate, Enfield,EN3. Submission of Environmental Statement Addendum.
Alma Estate EN3
Details submitted pursuant to reference 19/03624/VAR: car parking management plan (58) in respect of submission of planning application under Section 73 to amend conditions 2 (approved drawings), 3 (phasing plan), 7 (residential units), 8 (non-residential floorspace) and 52 (car parking provision) of outline planning permission 15/02039/OUT, as amended by 17/04670/VAR, to facilitate minor changes to residential unit numbers from 993 to 1,080, building heights, development zones, non residential floorspace, landscaping and play provision and parking provision in relation to Phases 2A and 4 of the Alma Estate, Enfield,EN3. Submission of Environmental Statement Addendum.
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 20/03821/RM: podium landscape scheme (8) in respect of details of reserved matters (scale, layout, external appearance and landscaping) for 300 units in respect Plots E and A (Phase 1a) arranged across buildings from 3 to 12 storeys in height pursuant to condition 5 of planning permission 16/01197/RE3 dated 10 July 2017 for development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). Application includes details pursuant to condition 29 (green procurement plan), condition 63 (biodiverse roof details), condition 65 (Energy statement), condition 86 (wind assessment), condition 71 (cycle parking details) and 73 (car parking details) of the above permission.
Alma Estate EN3
Details submitted pursuant to reference 19/03624/VAR: phase wide drainage (35) Phase 2A and 4 in respect of submission of planning application under Section 73 to amend conditions 2 (approved drawings), 3 (phasing plan), 7 (residential units), 8 (non-residential floorspace) and 52 (car parking provision) of outline planning permission 15/02039/OUT, as amended by 17/04670/VAR, to facilitate minor changes to residential unit numbers from 993 to 1,080, building heights, development zones, non residential floorspace, landscaping and play provision and parking provision in relation to Phases 2A and 4 of the Alma Estate, Enfield,EN3. Submission of Environmental Statement Addendum.
Meridian Water Willoughby Lane And Meridian Way London N18
PARTIAL DISCHARGE PLOT E1.1: Details pursuant to Ref: 16/01197/RE3 for verification report (11) verification report underlaps areas (40) drainage and suds implementation (44) in respect of the development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 16/01197/RE3: eradication strategy of invasive species (62) in respect of development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Falcon Road Spur Enfield EN3 4LX
Details pursuant to ref: 20/03070/FUL: ground levels (2), external lighting (3), hard and soft landscaping (4), SuDs (5), Construction Logistics Plan (6), for the reconfiguration of existing car park layout to provide car park spaces for residential, medical centre and community uses to be provided by Phase 2 of Alma Estate development, formation of vehicular access; and drop-off facility.
Alma Estate EN3
Details pursuant to ref: 19/03624/VAR: refuse and recycling facilities (56), Phase 2A for the submission of planning application under Section 73 to amend conditions 2 (approved drawings), 3 (phasing plan), 7 (residential units), 8 (non-residential floorspace) and 52 (car parking provision) of outline planning permission 15/02039/OUT, as amended by 17/04670/VAR, to facilitate minor changes to residential unit numbers from 993 to 1,080, building heights, development zones, non residential floorspace, landscaping and play provision and parking provision in relation to Phases 2A and 4 of the Alma Estate, Enfield,EN3. Submission of Environmental Statement Addendum.
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London
Details pursuant to Ref: 19/02718/RE3 for siting/design of refuse facilities per plot (61) in respect of the development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to three forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis)
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18
Details pursuant to Ref:19/02718/RE3 for Schedule of tenure/mix per phase (36) in respect of the development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to three forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis)