Queen Elizabeth Stadium, Donkey Lane, Enfield, EN1 3PL
Details of refuse storage, fume extraction, landscaping, turnstile railings, secure players entrance cage, siting, location and attachment of CCTV, noise monitoring and mitigation, survey of railings, brickwork, concrete and render (repairs and new works), precaution measures of protection and securitysubmitted pursuant to condition 2, 3, 7, 8, 9, 10, 11, 12, 15 & 16 of approval granted under ref: LBC/09/0026 for external works of repair to pavilion building comprising alterations to internal layout, installation of new services and fittings, installation of new finishes to floors and walls, external access ramps, lift, replacement glazing, replacement roof covering and replacement high level railings, extractor flue to roof at first floor level, south elevation, together with installation of turnstile to side, caged enclosure with 1.83m mesh infill panelled fencing and pedestrian access gates on north elevation leading from pavilion and pvc sleeved post and rail perimeter fencing (1.1m high) with mesh infill panels to sports field, covered and open standing terraces, 4 additional lighting columns (up to 20m high), two prefabricated dugouts, alterations to junction with Carterhatch Lane, widening of Donkey Lane, provision of car parking bays to Donkey Lane, provision of pedestrian footway, laying out of car and coach parking to south of pavilion.
Queen Elizabeth Stadium, Donkey Lane, Enfield, EN1 3PL
Details submitted to LBC/09/0026 for Areas of landscaping to the north, east and west sides of the pavilion submitted pursuant to condition 6 for external works of repair to pavilion building comprising alterations to internal layout, installation of new services and fittings, installation of new finishes to floors and walls, external access ramps, lift, replacement glazing, replacement roof covering and replacement high level railings, extractor flue to roof at first floor level, south elevation, together with installation of turnstile to side, caged enclosure with 1.83m mesh infill panelled fencing and pedestrian access gates on north elevation leading from pavilion and pvc sleeved post and rail perimeter fencing (1.1m high) with mesh infill panels to sports field, covered and open standing terraces, 4 additional lighting columns (up to 20m high), two prefabricated dugouts, alterations to junction with Carterhatch Lane, widening of Donkey Lane, provision of car parking bays to Donkey Lane, provision of pedestrian footway, laying out of car and coach parking to south of pavilion.
14 Beech Hill Avenue Barnet EN4 0LN
Details pursuant to ref: 19/01757/FUL: ground levels (3), finishing materials (4), surfacing materials (5), enclosure (6), low level fencing (7), Construction Management Plan (15), cycle parking (18), refuse and recycling storage (19), privacy screens (20), for the redevelopment of site and erection of 3 x 2-storey single family dwelling houses (comprising 2 x 5-bed and 1 x 7-bed), with accommodation in roof spaces, parking and refuse facilities, together with associated landscaping (Revised Plans).