Garage Site Rear Of 1-29 Bull Lane Link Road Wombourne
Condition 3 - External Materials - HT1 Condition 3 - External Materials - HT1.1 Condition 3 - External Materials - HT1.2 Condition 3 - External Materials - HT2 Condition 4 - Construction Management Plan Condition 5 - Drainage Plan Condition 8 - Hard and Soft Landscaping Plan Condition 9 - Boundary Treatment Plan
West Midlands Interchange Watling Street/Wolverhampton Road Gailey
The West Midlands Rail Freight Interchange Order 2020 (as amended by The West Midlands Rail Freight Interchange (Correction) Order 2020) Discharge of Requirement 4 (Detailed Design Approval) parts (b) and (h), Discharge of Requirement 5(1) - Demolition and Construction Environmental Management Plan (ref: WMI-WCL-EQ-XX-RP-LE-300008), Requirement 5(1) - Noise and Vibration Management Plan (ref: WMI-WCL-EAQ-XX-RP-LE-300003 Rev P04), Requirement 5(1) - Dust Management Plan (ref: WMI-WCL-EAQ-XX-RP-LE-300003 Rev P03), Requirement 5(1) - Water Management Plan (ref: WMI-WCL-EWE-XX-RP-LE-300003 Rev P03), Requirement 6(2) (Continued Access to WCML), Requirement 12(1) - Environmental Mitigation and Management Plan produced by Delta Simons dated March 2023, Requirement 15(1) - Earthworks Strategy Phase 2B produced by Burrows Graham (ref: WMI-BGL-GEN-XX-RP-CE-060011), Requirement 16(1) - Written Landscaping Scheme produced by FPCR dated March 2023, Requirement 24(2) - Temporary Construction Signage (refs: WMI-TSM-TTM-ZZ-DR-CH-010006, WMI-TSM-TTM-ZZ-DR-CH-010007, WMI-TSM-TTM-ZZ-DR-CH-010008)
West Midlands Interchange Watling Street/Wolverhampton Road Gailey
The West Midlands Rail Freight Interchange Order 2020 (as amended by The West Midlands Rail Freight Interchange (Correction) Order 2020) - Discharge of Requirement 4 (Detailed Design Approval) parts (b) and (h), Requirement 5(1) - Demolition and Construction Environmental Management Plan (ref: WMI-WCL-EQ-XX-RP-LE-300002) Requirement 5(1) - Noise and Vibration Management Plan (ref: WMI-WCL-EAQ-XX-RP-LE-300002), Requirement 5(1) - Dust Management Plan (ref: WMI-WCL-EAQ-XX-RP-LE-300002), Requirement 5(1) - Site Waste Management Plan (ref: WMI-WCL-EGN-XX-RP-LE-300006), Requirement 6(2) (Continued Access to WCML), Requirement 12(1) - Environmental Mitigation and Management Plan produced by Delta Simons dated 22 February 2023, Requirement 15(1) - Earthworks Strategy Phase 2A produced by Burrows Graham (ref: WMI-BGL-GEN-XX-RP-CE-060010), Requirement 16(1) - Written Landscaping Scheme produced by FPCR dated February 2023, Requirement 24(2) - Temporary Construction Signage (refs: WMI-TSM-TTM-ZZ-DR-CH-010006, WMI-TSM-TTM-ZZ-DR-CH-010007, WMI-TSM-TTM-ZZ-DR-CH-010008) and Requirement 27(1) (Surface Water Drainage Scheme), in connection with Earthworks
Garage Site Cotswold Avenue Great Wyrley Staffordshire WS6 6BU
Discharge of Conditions 5 - Materials, 7 - Landscape Scheme, 8 - Boundary Treatment, 9 - Construction Environmental Management Plan, 10 - Ecological Enhancement Plan, 11 - External Lighting, 12 - Drainage
New House Farm Gunstone Lane Codsall Staffordshire WV8 1EL
Discharge of conditions:- Condition 4 Landscaping Scheme Condition 6 Tree Protection Measures in AIA Condition 7 Drainage runs and excavations Condition 10 Biodiversity Enhancement Condition 11 Construction Method Statement Condition 12 External Lighting Scheme
Site Of Former Gorsty Lea Garage Wolverhampton Road Codsall Staffordshire
Discharge of Condition 6 (External Materials), Condition 7 (Floor Construction), Condition 8 (Cycle Parking), Condition 9 (Landscape Scheme) and Condition 10 (Bin Storage)
Horsefair Cottage 90 Bellbrook Penkridge STAFFORD ST19 5DL
Discharge of Conditions 3 (Landscape Scheme), 4 (Boundary Treatment), 5 (Facing Materials), 6 (Windows, doors and Rainwater Goods), 10 (Drainage), 11 (Finished Floor Levels) and 12 (Construction Management Plan)
Kinver High School Enville Road Kinver STOURBRIDGE DY7 6AA
Discharge of conditions of 17/00984/VAR Condition 3 - Landscape Scheme Condition 5 - Planting and Fencing Condition 6 - Construction Management Plan
Land Adjacent 18 Hillboro Rise Kinver Staffordshire DY7 6BS
Discharge of Conditions: Condition 3- Landscaping proposals are submitted with this application. Condition 5- The location of tree protection fencing is shown on the Tree Protection Plan within the Arboricultural Report submitted with this application. Condition 6- There is no construction work, drainage runs and excavation work proposed within the protective fencing/root protection areas of retained trees. Condition 10- A materials scheduled is submitted with this application. Condition 15- Boundary treatments are shown on drawing 20009/4B submitted with this application.
Land North Of Wobaston Road Pendeford South Staffordshire
Discharge conditions 4 - Landscape, Condition 5 - lighting, Condition 19 - Construction Environmental Management Plan and Condition 25 - fencing scheme