Development Site Tayfen Road Bury St Edmunds IP33 1TA
Application to discharge conditions - 7 (Development in accordance with the FRA), 9 (Maintenance etc of flood areas), 10 (Flood evacuation routes), 11 (Surface Water Drainage Scheme), 13 (Foul water drainage scheme), 14 (Acoustic Design Statement), 16 (Site and floor levels), 17 (Tree and Ecology Plan), 19 (Soft landscpaing measures), 20 (Hard landscaping measures), 21 (External materials), 29 (Details of parking etc areas (dwellings)) of DC/15/0689/OUT
Parcel F, Marham Park Tut Hill Fornham All Saints Suffolk
Application to discharge conditions C5 (LEMP), C20 (loading and manoeuvring), C21 (highways layout), C22 (surface water discharge), C23 (estate roads), C29 (arb method statement), C30 (soft landscaping), C31 (ground levels), C34 (construction method statement), C35 (foul water strategy, C36 (drainage scheme), C37 (recycling) and C43 (right of way protection) of application DC/13/0932/HYB for development zone F