Church Farm The Street Wiveton Holt Norfolk NR25 7TJ
Discharge of condition 3 (glazing details on north wing) and condition 7 (joinery) of planning permission RV/23/1210 (Variation of condition 2 (approved plans) of planning permission PF/22/0338 (Alterations to dwelling house and associated external works; conversion and extension of East Stable to habitable accommodation; conversion of North Range to habitable accommodation including replacement of roof structure; construction of detached garage to north-east of house; widening of southern entrance gateway and formation of new parking and turning area on west side of Church Farm; erection of boundary walls and railings)
Church Farm The Street Wiveton Holt Norfolk NR25 7TJ
Discharge of condition 8 (boundary walls and fence details) of planning permission PF/22/0338 (Alterations to dwelling house and associated external works; conversion and extension of East Stable to habitable accommodation; conversion of North Range to habitable accommodation including replacement of roof structure; construction of detached garage to north-east of house; widening of southern entrance gateway and formation of new parking and turning area on west side of Church Farm; erection of boundary walls and railings)
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 7, part discharge (Materials) and Condition 8, part discharge (Construction Environmental Management Plan) of planning permission 17/01878/OUT for a Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Beck Farmhouse 123 The Street Hindolveston Dereham Norfolk NR20 5DD
Discharge of condition 4 (ecological mitigation) and condition 5 (construction environmental management plan) of planning permission PF/22/1800 (Alterations and extensions to farm house and modifications to detached coach house to create games room & study / gym)
Manor Farm Barn Thistleton Road Market Overton Rutland
Discharge of Condition 6 (Ground contamination), Condition 7 (Written Scheme of Investigation (Archaeology)), Condition 11 (Landscaping) and Condition 13 (Tree Protection) of planning application 2021/0979/FUL- Demolition of existing barn and agricultural silos. Construction of 2 storey dwelling and ancillary works, garaging, landscaping and alterations to the existing access.
Church Farm The Street Wiveton Holt Norfolk NR25 7TJ
Discharge of condition 3 (glazing details) and condition 7 (sections for windows and doors) on planning permission PF/22/0338 ( Alterations to dwelling house and associated external works; conversion and extension of East Stable to habitable accommodation; conversion of North Range to habitable accommodation including replacement of roof structure; construction of detached garage to north-east of house; widening of southern entrance gateway and formation of new parking and turning area on west side of Church Farm; erection of boundary walls and railings)
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 6 (plans/sections) (partial discharge), Condition 7 (Materials) (partial discharge), Condition 16 (Security/Access) (partial discharge) Condition 21 (surface water drainage scheme) of Planning Permission 17/01878 for Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Legoland Windsor Resort Winkfield Road Windsor SL4 4AY
Details required by Condition 3 (Parcel Plan) and Condition 17 (partial dischage) (Archaeology - projects 1 and 2) of planning permission 17/01878/OUT for a Hybrid planning application seeking permission for the following Full (detailed) projects: Project 1 - the erection of 65 permanent semi-detached lodges (130 units) and 20 'barrels' with associated amenity facilities block to provide visitor accommodation, a central facilities 'hub' building, SUDS ponds, landscaping works (including equipped play areas) and associated infrastructure works ('Phase 1' of the holiday village); Project 2 - Reconfiguration of car parking and internal accesses and associated engineering/infrastructure works; Project 3 - Change of use of existing farm buildings from agricultural/'sui generis' use to Use Class D2, ancillary 'back of house'; accommodation and land for re-use by the theme park and the creation of one new access point from the existing car park and Project 4 - Extension and alterations to 'The Beginning' comprising new admissions building, extension to existing toilet facilities and new entrance portal. Permission for the following Outline projects: Project 5 - Construction of the '2019 attraction' comprising three 'attraction zones' for up to three new rides (one to be an indoor attraction and the other two to be uncovered or covered) with associated queue line areas, landscaping works and associated infrastructure; Project 6 - Construction of a new indoor ride on the 'Haunted House' site with associated queue line area, landscaping works and associated infrastructure; Project 7 - Extension to the existing 'Big Shop' LEGO store in 'The Beginning' area; Project 8 - Erection of up to 300 units of visitor accommodation ('Phases 2 and 3' of the holiday village) with two associated central facilities 'hub' buildings, SUDS ponds, landscaping, infrastructure works and car parking area.
Trout Farm Cockleford Farm Cockleford Cowley Gloucestershire
Compliance with condition 4 (Colour finishes) re permission 21/02069/FUL - Variation of condition 2 (approved plans) of permission 19/03628/FUL (Construction of an agricultural building) to allow an increase of its height by 1m and alteration to the location of the roller shutter door
Manor House Farm HOUGHTON LE SIDE DARLINGTON DL2 2XH
Approval of details reserved by conditions 3 (windows/staircase/cladding/finishes/hard landscaping), 6 (swept path analysis), 7 (Construction Method Statement), 8 (Bin Storage), 10 (Surface Water Drainage) and 11 (Phase 1 Risk Ass) attached to planning permission 18/00910/FUL dated 21 February 2019 (Change of use and alterations to existing farm buildings to form 4 No. dwellings) (Amended and additional plans and information received 11 February 2021)