Dower House Hotel Bond End Knaresborough North Yorkshire HG5 9AL
Approval of details under condition 4 of permission 22/01750/LB - Listed building application for the erection of rear extension, portico entrance, accessible ramp, pergolas, retaining wall and keg store, replacement of roof coverings, repairs to brickwork, formation of footpath and parking, installation of extract flue, ventilation, external lighting, rainwater goods, signage and condenser units, demolition of shed and garage with associated hard and soft landscaping works and internal alterations to include installation and removal of walls, doors and windows and staircase.
Dower House Hotel Bond End Knaresborough North Yorkshire HG5 9AL
Approval of details under condition 5 of permission 22/01750/LB - Listed building application for the erection of rear extension, portico entrance, accessible ramp, pergolas, retaining wall and keg store, replacement of roof coverings, repairs to brickwork, formation of footpath and parking, installation of extract flue, ventilation, external lighting, rainwater goods, signage and condenser units, demolition of shed and garage with associated hard and soft landscaping works and internal alterations to include installation and removal of walls, doors and windows and staircase.
The Airfield Bagby North Yorkshire YO7 2PH
Application for discharge of Conditions 3 (wheel washing), 4 (surface water drainage), 5 (site access), 9 (visibility splays), 10 (watercourses), 11 (access road), 27 (aircraft transponders) and 28 (aircraft monitoring) to previously approved application 16/02240/FUL - Change of use and external alterations of the engineering building to be used as a clubhouse and control tower, erection of a new tractor shed, erection of a new hangar, formation of a new access drive, the introduction of hard and soft landscaping and amended on 14 March 2018 to include the creation of a fixed fuel facility and the use of Hangar B for aircraft maintenance. Works include the demolition of the existing clubhouse, control tower, hangars and storage buildings and partial demolition of one other hangar. Air Movements to be capped at a maximum of 8,440 per annum.