55 Eversley Park Road London N21 1NR
Details pursuant to ref: 23/01590/FUL for demolition and construction management plan (6), refuse storage (8), energy statement (9), internal consumption of potable water (11), landscaping (12), Sustainable Drainage Strategy (13), cycle parking spaces (14), ecological enhancements (15) and boundary treatments (16) in respect of the redevelopment of site involving demolishment of existing bungalow and erection of 2-storey dwelling house with rear dormer and front and side rooflights and side roof solar panels.
Middle Oak Chapel Croft Chipperfield Kings Langley Hertfordshire WD4 9EQ
Details required by condition 8 (Landscaping) and condition 10 (Cycle Stores) attached to planning permission 21/03396/FUL (Demolition of existing chalet bungalow and garage. Construction of 4 no. detached three-bedroom dwellings and associated car parking and landscaping).
16 -34 Randalls Ride Hemel Hempstead Hertfordshire HP2 5AQ
Details required by condition 7 (Construction management plan) attached to planning permission 20/03938/MFA (Demolition of existing bungalows, flats and garages. Construction of 2 no. apartment blocks comprising of 30 dwellings with associated car parking and landscaping.)
16-34 Randalls Ride Hemel Hempstead Hertfordshire HP2 5AQ
Details as required by condition 9 (drainage) attached to planning permission 20/03938/MFA (Demolition of existing bungalows, flats and garages. Construction of 2 no. apartment blocks comprising of 30 dwellings with associated car parking and landscaping.)
16-34 Randalls Ride Hemel Hempstead Hertfordshire HP2 5AQ
Details as required by condition 8 (EV car charging) attached to planning permission 20/03938/MFA (Demolition of existing bungalows, flats and garages. Construction of 2 no. apartment blocks comprising of 30 dwellings with associated car parking and landscaping.)
16-34 Randalls Ride Hemel Hempstead Hertfordshire HP2 5AQ
Details as required by condition 15 (Biodiversity Enhancement) attached to planning permission 20/03938/MFA (Demolition of existing bungalows, flats and garages. Construction of 2 no. apartment blocks comprising of 30 dwellings with associated car parking and landscaping).
532 Hitchin Road Luton LU2 7UF
Erection of 3 two storey 2 bedroom detached dwellings after demolition of existing two bed bungalow. Discharge of conditions 3 (Details/specification of external materials), 4 (Construction Method Plan), 5 (Contamination Phase 1 site investigation report), 6 (Noise impact assessment), 7 (Landscaping scheme), 9 (Surface water drainage) and 11 (Arboricultural details) of Planning permission 22/01233/FUL dated 22nd December 2022.
46 The Gallop South Croydon CR2 7LP
Discharge of condition 3 (Construction Logistics Plan) attached to planning permission ref. 22/04255/FUL (Partial demolition and extension of existing bungalow, upwards and to the side and rear to create 1 x 2 bedroom dwelling and 1 x 3 bedroom dwelling, associated landscaping, car parking and refuse storage)
Bag End Hogpits Bottom Flaunden Hemel Hempstead Hertfordshire HP3 0PX
Details as required by condition 3 (Hard & soft landscaping) attached to planning permission 4/02861/16/FUL (Demolition of existing bungalow and construction of new dwelling).
7 Briar Close & 8 Blackwell Grove DARLINGTON
Approval of details reserved by condition 3 (CMP) attached to planning permission 22/01252/FUL dated 02 Feb 2023 (Conversion of existing bungalow (8 Blackwell Grove) and amalgamation of plots to create pool house and gymnasium for use by 7 Briar Close with the erection of a linked extension with pergola and patio area, replacement raised roof with 4 no. dormer windows, new pitched roof to garage and incorporating conversion of integral garage within main dwelling into habitable space. Single storey extension to the rear of No 7 Briar Close. Landscaping works including removing access from Briar Close with the repositioning of electronic access gates with stone piers (off Blackwell Grove) and infill gap to form brick boundary wall, hard standing, gazebo, 1.2m high fencing and associated landscaping works) (Amended Construction Management Plan received 20 March 2023)