Incleboro Fields Caravan Club Site Station Close West Runton Cromer Norfolk NR27 9QG
Discharge of conditions 5 (foul drainage scheme),6 (installation of any plant, machinery, ventilation, air conditioning, heating, extraction equipment including any replacements of such, full details including location, acoustic specifications, and specific measures to control noise/dust/odour from the equipment ), 9 (external lighting) & 12 (materials to be used in the construction of the surfaces of the pitches) of planning permission PF/22/1337 (Redevelopment of site to include: pitch surface improvements, creation of serviced pitches, erection of site managers bathroom/utility pods, creation of multi-use games area (MUGA) and childrens play area with associated fencing, upgrading two motor van waste and one service point(s) and extension of internal road network)
Church Farm The Street Wiveton Holt Norfolk NR25 7TJ
Discharge of condition 8 (boundary walls and fence details) of planning permission PF/22/0338 (Alterations to dwelling house and associated external works; conversion and extension of East Stable to habitable accommodation; conversion of North Range to habitable accommodation including replacement of roof structure; construction of detached garage to north-east of house; widening of southern entrance gateway and formation of new parking and turning area on west side of Church Farm; erection of boundary walls and railings)
Land Parcel Between Grannys End Road And A142 Off Marroway Lane Witchford Cambridgeshire
To discharge condition number 6 (Noise Attenuation Fencing Details) of Decision dated 21/01406/VAR to vary Condition 1 (Approved plans), 3 (External materials), 7 (Soft landscape), 9 (Biodiversity), 11 (Vehicular crossing), 14 (Access Road), 15 (Construction Environmental Management Plan), 16 (Archaeology), 17 (Hard landscaping), 18 (Foul and surface water), and 19 (Contamination) of previously approved 19/01748/VAR for To vary condition 1 (Approved Plans) of decision notice 19/00804/FUL dated 18/11/2019 for the erection of 4 detached dwellings with detached garages, car parking and associated amenity space
Land Opp Power Station (Plot E) Humber Gate Energy Park Way Grimsby North East Lincolnshire
Details in discharge of Condition 6 (Construction Management Plan) and 7 (Piling) pursuant to DM/0625/19/FUL (Erection of industrial manufacturing building, installation of attenuation tank, erection of 2.4m high palisade fence/gates and make existing access redundant and create new access)
Land East Of Grove Lane Somersal Herbert Derbyshire
Discharge of condition 7 i) of planning appeal APP/P1045/C/20/3255861 - Change of use of land to use as a residential caravan site including the stationing of 13 caravans of which no more than 5 shall be static caravans, laying of hardstanding, erection of 4 no. amenity buildings and, construction of boundary fencing
Land South Of Gorse Lane Silk Willoughby Sleaford Lincolnshire
Application to discharge condition 3 (Pre-construction Condition Survey), 4 (Construction Management Plan and Method Statement), 5 (Landscape and Ecological Management Plan and Enhancement Plan), 6 ( Tree and Hedgerow Planting) and 10 (Work Written Specification) attached to application 19/0060/FUL - Erection of Solar PV park (circa 20MW electricity generating capacity) including inverters, substations, office building, store, perimeter fencing, access tracks, temporary construction compound and associated development.
Arrowbuild And Civil Engineering Limited Whitehouse Innovation Park New Road Billingham TS23 1LE
Information to discharge condition no4 (Construction Management Plan) and no6 (Surface Water Management) of planning approval 21/2553/FUL - Erection of 1no warehouse building and a two storey office building with ancillary trade counter. Installation of hardstanding and creations of parking areas. Creation of a new vehicle access, erection of new fence and associated external alterations
Land East Of Grove Lane Doveridge Derbyshire
Discharge of condition 7 i) of planning appeal APP/P1045/C/20/3255861 - Change of use of land to use as a residential caravan site including the stationing of 13 caravans of which no more than 5 shall be static caravans, laying of hardstanding, erection of 4 no. amenity buildings and, construction of boundary fencing
Installation Of High Voltage Direct Current (DC) Cables For The Viking Link Interconnector Project Between Proposed Landfall At Boygrift In East Lindsey To A Proposed Converter Station At North Ing Drove In South Holland
Application to discharge condition 14 (Archaeological Mitigation) attached to application 17/1200/FUL - Works to facilitate the Viking Link electrical interconnector with an approximate capacity of 1400 megawatts (MW) extending from Revsing, Jutland, (Denmark) to Bicker Fen, Lincolnshire (UK) comprising: - Installation of two (2) subsea high voltage direct current (DC) cables between Mean Low Water Springs (MLWS) and landfall at Boygrift in East Lindsey; - Installation of two (2) onshore DC cables between the landfall at Boygrift and the converter station at North Ing Drove in South Holland; - Construction of associated Temporary Construction Compounds (TCC) and Temporary Works Areas (TWA) and temporary vehicle access arrangements required for DC and AC cable installation; - Erection of converter station buildings together with the formation of internal roads, permanent access road from the A52, erection of security fencing, formation of landscaping with associated temporary construction compounds; - Installation of up to six (6) onshore high voltage alternating current (AC) cables between the converter station at North Ing Drove and the existing Bicker Fen 400 kilovolt (400kV) Substation owned and operated by National Grid Electricity Transmission Plc (NGET); - Installation of link pillars along the AC cable route for inspection and maintenance purposes, these will be contained within fenced areas; - Installation of two substation bays at Bicker Fen Substation to allow Viking Link to be connected to the National Grid electricity transmission system; - Installation of all associated drainage mitigation works; and - Installation of fibre-optic cable(s) with the high voltage AC and DC cables (A bay consists of switching equipment including circuit breakers, disconnector and measuring equipment. NGET will be providing Viking Link the space available to connect to Bicker Fen).
Installation Of High Voltage Direct Current (DC) Cables For The Viking Link Interconnector Project Between Proposed Landfall At Boygrift In East Lindsey To A Proposed Converter Station At North Ing Drove In South Holland;
Application to discharge condition 5 (Landscape Restoration) attached to planning permission 17/1200/FUL - Works to facilitate the Viking Link electrical interconnector with an approximate capacity of 1400 megawatts (MW) extending from Revsing, Jutland, (Denmark) to Bicker Fen, Lincolnshire (UK) comprising: - Installation of two (2) subsea high voltage direct current (DC) cables between Mean Low Water Springs (MLWS) and landfall at Boygrift in East Lindsey; - Installation of two (2) onshore DC cables between the landfall at Boygrift and the converter station at North Ing Drove in South Holland; - Construction of associated Temporary Construction Compounds (TCC) and Temporary Works Areas (TWA) and temporary vehicle access arrangements required for DC and AC cable installation; - Erection of converter station buildings together with the formation of internal roads, permanent access road from the A52, erection of security fencing, formation of landscaping with associated temporary construction compounds; - Installation of up to six (6) onshore high voltage alternating current (AC) cables between the converter station at North Ing Drove and the existing Bicker Fen 400 kilovolt (400kV) Substation owned and operated by National Grid Electricity Transmission Plc (NGET); - Installation of link pillars along the AC cable route for inspection and maintenance purposes, these will be contained within fenced areas; - Installation of two substation bays at Bicker Fen Substation to allow Viking Link to be connected to the National Grid electricity transmission system; - Installation of all associated drainage mitigation works; and - Installation of fibre-optic cable(s) with the high voltage AC and DC cables (A bay consists of switching equipment including circuit breakers, disconnector and measuring equipment. NGET will be providing Viking Link the space available to connect to Bicker Fen).