Car Park Hill Side Mill Quarry Lane Swaffham Bulbeck
To discharge Condition 2 (External Lighting) of decision dated 21/04/2022 for 21/01611/VARM Variation of Condition 1 (approved plans) 20 (external brickwork) and 21 (external materials and fenestration) of previously approved 19/01721/VAR To vary condition 1 (approved plans) of previously approved 17/01231/FUM for construction of 19 dwellings with associated parking and amenity space and retention of existing offices on site
Car Park Hill Side Mill Quarry Lane Swaffham Bulbeck
To discharge Conditions 3 (Surface water drainage), 9 (Hard landscape), and 10 (Boundary) of decision dated 21/04/2022 for 21/01611/VARM Variation of Condition 1 (approved plans) 20 (external brickwork) and 21 (external materials and fenestration) of previously approved 19/01721/VAR To vary condition 1 (approved plans) of previously approved 17/01231/FUM for construction of 19 dwellings with associated parking and amenity space and retention of existing offices on site
Glebe Farm Helpringham Road Burton Pedwardine Sleaford Lincolnshire NG34 0BX
Application to discharge conditions 2 (materials), 3 (windows and doors-dwelling), 4 (windows and doors - garden room), 6 (contamination) and 7 (tree protection) to planning permission 22/0518/FUL -and conditions 2 (materials), 3 (windows and doors-dwelling) and 4 (windows and doors - garden room) to listed building consent 220533/LBC - Conversion of barn to dwelling and conversion of garage to garden room/office along with construction of vehicular access (Amended description)
Car Park Hill Side Mill Quarry Lane Swaffham Bulbeck
To discharge condition numbers 8 (Soft Landscaping Scheme) and 16 (Biodiversity Improvements) of Decision dated 22.4.2022 for Variation of Condition 1 (approved plans) 20 (external brickwork) and 21 (external materials and fenestration) of previously approved 19/01721/VAR To vary condition 1 (approved plans) of previously approved 17/01231/FUM for construction of 19 dwellings with associated parking and amenity space and retention of existing offices on site
East Carr Farm Barkers Lane Snainton Scarborough North Yorkshire YO13 9BD
Discharge of conditions 2 (external materials) & 4 (window & door spec) on decision 21/00207/FL for retrospective planning to form pitched roof over previous flat roof to the front of dwelling, the addition of a roofed veranda and replacement sliding door. Change of use from agricultural outbuilding to form additional dwelling space (Gymnasium). Demolition of barns to open courtyard. Demolition of existing agricultural buildings to enable construction of home offices, domestic workshop, carport and machinery store within footprint of existing agricultural buildings
32 High Street Ingatestone Essex CM4 9EE
Discharge of condtion 5 (Construction Method Statement), Condition 9 (Surface Materials of doors/fenestration/eaves/verges), Condition 10 (Landscaping) for application 18/01234/FUL (Add first floor rear extension with gable roof and convert office building into four No. two-bedroom flats and one No. one-bedroom flat together with construction of detached 1 bed dwelling to the rear together with car parking, cycle and refuse store and hard and soft landscaping)
Cemetery House Church Street London N9 9HP
Details pursuant to ref: 18/04864/FUL: Construction Management Plan (3), surfacing materials (5), boundary treatments (6), external materials (7), cycle parking (8), waste management facilities (9), landscaping (10), Bat Survey (11), biodiversity enhancements (17), for the demolition of the former Coach house and erection of terrace of 4 x 2 bed single family dwellings with amenity space together with part demolition and renovation of Cemetery house to provide Offices at ground and first floor level involving lowering and extension to existing basement, single storey rear extension with internal terraces, rear dormers with rooflights, replacement windows and alterations to existing lightwells and creation of an additional lightwell together with the construction of new hardstanding with garages ,car parking spaces, installation of fencing, new site access to south boundary and access gates for pedestrians and vehicles.