Search Results

Found 14 planning applications

22/01237/DIS | Discharge of Condition(s)

The Boatyard Bolton Road Hoghton

Application to discharge condition nos. 5 (materials), 6 (construction management plan), 13 (method statement for biosecurity measures), 14 (foul and surface water treatment), 15 (construction environmental management plan), 17 (landscaping scheme), 20 (drainage strategy), 21 (construction surface water management plan), 22 (operation and maintenance manual for surface water drainage), 24 (canal risk assessment and method statement) and 25 (ground contamination) of planning permission ref: 21/01473/FULMAJ (Demolition of the former Grill & Grain Public House and erection of a two storey office building and change of use of the former annex building from ancillary accommodation to commercial use (falling within Use Classes E(a) display or retail sale of goods, other than hot food, E(b) sale of food and drink for consumption (mostly) on the premises, E(c) i financial services, E(c)ii professional services (other than medical services) and/or E(g)i office) with associated car parking, landscaping and works)

Local Authority
Chorley Council
Type
Approval (Discharge) of conditions (Discharge of Condition(s))
Decision
(Condition(s) discharged)
Application Validated
30/11/2022
Erection Demolition Construction Landscaping Discharge Accommodation Office Shop House
TP/06/1430/DP1 | Discharge Condition

1-5, Coleman Parade, And New River House, 6A, Coleman Parade, 6-14, Southbury Road, Enfield, EN1

Details of ground floor layout, phasing of construction, hard and soft landscaping, external finishing materials, shopfronts to Coleman Parade and archaeological work programme submitted pursuant to conditions 02, 03, 09, 10, 11 & 17 of approval under appeal ref: APPQ5300/A/07/2041815/NWF (TP/06/1430) for construction of 191 residential units involving conversion and extension of New River House (block A) by the erection of a side extension to east elevation at 4th storey level and above, together with construction of three additional floors to total 13 stories providing 94 units (41 x 1-bed, 44 x 2-bed, 1 x 1-bed duplex, 8 x 2-bed duplex) with car parking at 1st floor level; demolition of first floor of No. 1-5 Coleman Parade (block B) and erection of 5 additional floors to total 6 stories providing 20 x 2-bed units together with installation of new shop fronts to ground floor commercial units and glazed link to New River House from 1st floor level and above; erection of a 9-storey block to the rear (block C) comprising 77 units (42 x 1-bed, 35 x 2-bed) with car parking on ground and 1st floor levels with 1st floor vehicular access to New River House; construction of sub-station to rear and provision of associated cycle parking.

Local Authority
Enfield Council
Type
Approval (Discharge) of conditions (Discharge Condition)
Decision
Withdrawn (Application Withdrawn)
Application Received
02/10/2009
Application Validated
02/10/2009
Extension Erection Demolition Construction Conversion Landscaping Residential Shop House
COND/2022/0202 | Discharge of Conditions

Land At Victoria Way And Church Street West Church Street West Woking Surrey

Submission of details pursuant to Condition 4 (Construction Environmental Management Plan) of planning permission ref: PLAN/2018/0444 (Section 73 application to vary Condition 1 (approved plans) of permission ref: PLAN/2014/0014 (Erection of new shops (10,967 sq.m. in Use Classes A1, A2, A3, A5) and medical or commercial floorspace (526 sq.m. in Use Classes D1, D2, B1 or A2). 190 bed hotel of 23 storeys (including plant) (Class C1) with conference facilities, basement level spa and gym. 392 residential apartments (Class C3) with Tower 1, 34 storeys and Tower 2, 30 storeys. Construction of a new local energy centre at the Red Car Park, changes and extension to the Red and Yellow Car Park together with a new Green car park to provide 380 (net) new parking spaces. Creation of a new public square and new civic space and highway works including servicing to Wolsey Place and delivery provision. Closure of Cawsey Way and Church Street West, new all movements junction at Goldsworth Road/Victoria Way and High Street to be one way west with new bus stops and cycle lane. Demolition of the Fire Station, Globe House and part of the existing Wolsey Place Shopping centre) to allow: The provision of 37x additional residential units and associated alterations to housing mix, alterations to car parking provision and extension to Red Car Park, provision of additional stairwells to Towers 1 and 2 and alterations to external finishes, various internal and external alterations and alterations to the level of commercial floor space))

Local Authority
Woking Borough Council
Type
Approval (Discharge) of conditions (Discharge of Conditions)
Decision
Approved (Permitted)
Application Validated
23/11/2022
Extension Alteration Erection Demolition Construction Residential Flat Shop House
18/02536/CND | Discharge Condition

103 & Commercial Premises At Rear Of, Chase Side, Enfield, EN2 6NL

Details submitted pursuant to ref:P13-02570PLA comprising of details of materials (4), hard surfacing (7), details of enclosure (8), biodiversity enhancements (13), details of external lighting (17), construction methodology (22), construction site waste management plan (23) and satellite dish / TV antenna (24) in respect of Redevelopment of site to provide 5 additional dwellings involving demolition of north barn and erection of a part single, part 2-storey block to provide 2 x 2-bed single family dwellings, conversion of south barn involving a part single, part 2-storey side extension to provide 3 residential units comprising 2 x 2-bed and 1 x 3-bed single family dwellings, demolition of conservatory to existing farm house and shop, off street parking and associated landscaping.

Local Authority
Enfield Council
Type
Approval (Discharge) of conditions (Discharge Condition)
Decision
Withdrawn (Application Withdrawn)
Application Received
22/06/2018
Application Validated
22/06/2018
Extension Erection Demolition Construction Conversion Dwelling Agricultural Landscaping Residential Conservatory Shop House
223450CND | Discharge Condition

Copley Close Estate And Land Between No's 11 And 15 Templeman Road; Copley Close Copley Close Hanwell W7 1QG London

Submission of a construction method statement for Phase 3, pursuant to condition 5 of planning permission ref: PP/2013/2127 dated 23/10/2013 (as amended by 160995VAR, dated 04/08/2016) for 'Erection of a two-storey, 3-bedroom house on land between Nos 11 and 15 Templeman Road; demolition of various buildings within the Copley Close Estate including 76 dwellings, warden's accommodation, 288 sq. m. floor space in retail use (A1 Use Class), 195 sq.m. floor space in community use (D1 Use Class), garages and other structures and the erection of 204 dwellings (36 x 1-bedroom flats, 132 x 2-bedroom flats, 5 x 3-bedroom flats, 3x 3-bedroom houses and 28 x 4-bedroom houses) contained in buildings between 3-storeys and a maximum of 6-storeys; replacement retail (A1 Use Class) and community (D1 Use Class) facilities comprising 420 sq. m. floor space; erection of a single-storey detached building comprising a laundry and meeting room for use by residents of the retained sheltered accommodation; new energy centres for the existing and new development; reconfiguration of 14 x 1-bedroom flats to form 7 x 3-bedroom wheelchair accessible flats; refurbishment, internal and external alterations and additions to existing apartment blocks including new fenestration, external cladding, balconies, walkways, core entrances including integral refuse stores, passenger lifts, external and internal stairs, ramps to under-croft parking areas; feature lighting to existing chimney; alterations to the public highway to accommodate reconfigured and new parking providing a total of 386 spaces on-street, within under-croft parking areas and parking courts; engineering operations associated with decking over / enclosing under-croft areas to form balconies, landscaping and walkways; public realm works including lighting, landscaping and children's play equipment (Deemed Consent Application).'

Local Authority
Ealing Council
Type
Approval (Discharge) of conditions (Discharge Condition)
Decision
Approved (Approved)
Application Received
08/08/2022
Application Validated
08/08/2022
Alteration Erection Demolition Construction Development Dwelling Landscaping Windows Flat Accommodation Shop House
223452CND | Discharge Condition

Copley Close Estate And Land Between No's 11 And 15 Templeman Road; Copley Close Copley Close Hanwell W7 1QG London

Submission of a Construction Logistics Plan in pursuant to condition 4 of planning permission ref: PP/2013/2127 dated 23/10/2013 (as amended by 160995VAR dated 04/08/2016) for 'Erection of a two-storey, 3-bedroom house on land between Nos 11 and 15 Templeman Road; demolition of various buildings within the Copley Close Estate including 76 dwellings, warden's accommodation, 288 sq. m. floor space in retail use (A1 Use Class), 195 sq.m. floor space in community use (D1 Use Class), garages and other structures and the erection of 204 dwellings (36 x 1-bedroom flats, 132 x 2-bedroom flats, 5 x 3-bedroom flats, 3x 3-bedroom houses and 28 x 4-bedroom houses) contained in buildings between 3-storeys and a maximum of 6-storeys; replacement retail (A1 Use Class) and community (D1 Use Class) facilities comprising 420 sq. m. floor space; erection of a single-storey detached building comprising a laundry and meeting room for use by residents of the retained sheltered accommodation; new energy centres for the existing and new development; reconfiguration of 14 x 1-bedroom flats to form 7 x 3-bedroom wheelchair accessible flats; refurbishment, internal and external alterations and additions to existing apartment blocks including new fenestration, external cladding, balconies, walkways, core entrances including integral refuse stores, passenger lifts, external and internal stairs, ramps to under-croft parking areas; feature lighting to existing chimney; alterations to the public highway to accommodate reconfigured and new parking providing a total of 386 spaces on-street, within under-croft parking areas and parking courts; engineering operations associated with decking over / enclosing under-croft areas to form balconies, landscaping and walkways; public realm works including lighting, landscaping and children's play equipment (Deemed Consent Application).'

Local Authority
Ealing Council
Type
Approval (Discharge) of conditions (Discharge Condition)
Decision
Approved (Approved)
Application Received
08/08/2022
Application Validated
08/08/2022
Alteration Erection Demolition Construction Development Dwelling Landscaping Windows Flat Accommodation Shop House
COND/2022/0119 | Discharge of Conditions

Victoria Square Development Land At Victoria Way And Church Street West Woking Surrey

Submission of details pursuant to Condition 28 (Lighting) of planning permission PLAN/2018/0444 (Section 73 application to vary Condition 1 (approved plans) of permission ref: PLAN/2014/0014 (Erection of new shops (10,967 sq.m. in Use Classes A1, A2, A3, A5) and medical or commercial floorspace (526 sq.m. in Use Classes D1, D2, B1 or A2). 190 bed hotel of 23 storeys (including plant) (Class C1) with conference facilities, basement level spa and gym. 392 residential apartments (Class C3) with Tower 1, 34 storeys and Tower 2, 30 storeys. Construction of a new local energy centre at the Red Car Park, changes and extension to the Red and Yellow Car Park together with a new Green car park to provide 380 (net) new parking spaces. Creation of a new public square and new civic space and highway works including servicing to Wolsey Place and delivery provision. Closure of Cawsey Way and Church Street West, new all movements junction at Goldsworth Road/Victoria Way and High Street to be one way west with new bus stops and cycle lane. Demolition of the Fire Station, Globe House and part of the existing Wolsey Place Shopping centre) to allow: The provision of 37x additional residential units and associated alterations to housing mix, alterations to car parking provision and extension to Red Car Park, provision of additional stairwells to Towers 1 and 2 and alterations to external finishes, various internal and external alterations and alterations to the level of commercial floor space)

Local Authority
Woking Borough Council
Type
Approval (Discharge) of conditions (Discharge of Conditions)
Decision
Approved (Permitted)
Application Validated
24/06/2022
Extension Alteration Erection Demolition Construction Residential Flat Shop House
COND/2022/0067 | Discharge of Conditions

Victoria Square Development Land At Victoria Way And Church Street West Church Street West Woking Surrey

Submission of details pursuant to Condition 29 (Accessibility) of planning permission PLAN/2018/0444 (Section 73 application to vary Condition 1 (approved plans) of permission ref: PLAN/2014/0014 (Erection of new shops (10,967 sq.m. in Use Classes A1, A2, A3, A5) and medical or commercial floorspace (526 sq.m. in Use Classes D1, D2, B1 or A2). 190 bed hotel of 23 storeys (including plant) (Class C1) with conference facilities, basement level spa and gym. 392 residential apartments (Class C3) with Tower 1, 34 storeys and Tower 2, 30 storeys. Construction of a new local energy centre at the Red Car Park, changes and extension to the Red and Yellow Car Park together with a new Green car park to provide 380 (net) new parking spaces. Creation of a new public square and new civic space and highway works including servicing to Wolsey Place and delivery provision. Closure of Cawsey Way and Church Street West, new all movements junction at Goldsworth Road/Victoria Way and High Street to be one way west with new bus stops and cycle lane. Demolition of the Fire Station, Globe House and part of the existing Wolsey Place Shopping centre)

Local Authority
Woking Borough Council
Type
Approval (Discharge) of conditions (Discharge of Conditions)
Decision
Approved (Permitted)
Application Validated
22/03/2022
Extension Erection Demolition Construction Residential Flat Shop House
COND/2022/0071 | Discharge of Conditions

Land At Victoria Way And Church Street West Church Street West Woking Surrey

Submission of details pursuant to Condition 39 (Signage Strategy) of planning permission PLAN/2018/0444 (Section 73 application to vary Condition 1 (approved plans) of permission ref: PLAN/2014/0014 (Erection of new shops (10,967 sq.m. in Use Classes A1, A2, A3, A5) and medical or commercial floorspace (526 sq.m. in Use Classes D1, D2, B1 or A2). 190 bed hotel of 23 storeys (including plant) (Class C1) with conference facilities, basement level spa and gym. 392 residential apartments (Class C3) with Tower 1, 34 storeys and Tower 2, 30 storeys. Construction of a new local energy centre at the Red Car Park, changes and extension to the Red and Yellow Car Park together with a new Green car park to provide 380 (net) new parking spaces. Creation of a new public square and new civic space and highway works including servicing to Wolsey Place and delivery provision. Closure of Cawsey Way and Church Street West, new all movements junction at Goldsworth Road/Victoria Way and High Street to be one way west with new bus stops and cycle lane. Demolition of the Fire Station, Globe House and part of the existing Wolsey Place Shopping centre)

Local Authority
Woking Borough Council
Type
Approval (Discharge) of conditions (Discharge of Conditions)
Decision
Approved (Permitted)
Application Validated
28/03/2022
Extension Erection Demolition Construction Residential Flat Shop House
COND/2022/0040 | Discharge of Conditions

Land At Victoria Way And Church Street West Church Street West Woking Surrey

Submission of details pursuant to Condition 40 (Town Centre Permeability) of planning permission PLAN/2018/0444 (Section 73 application to vary Condition 1 (approved plans) of permission ref: PLAN/2014/0014 (Erection of new shops (10,967 sq.m. in Use Classes A1, A2, A3, A5) and medical or commercial floorspace (526 sq.m. in Use Classes D1, D2, B1 or A2). 190 bed hotel of 23 storeys (including plant) (Class C1) with conference facilities, basement level spa and gym. 392 residential apartments (Class C3) with Tower 1, 34 storeys and Tower 2, 30 storeys. Construction of a new local energy centre at the Red Car Park, changes and extension to the Red and Yellow Car Park together with a new Green car park to provide 380 (net) new parking spaces. Creation of a new public square and new civic space and highway works including servicing to Wolsey Place and delivery provision. Closure of Cawsey Way and Church Street West, new all movements junction at Goldsworth Road/Victoria Way and High Street to be one way west with new bus stops and cycle lane. Demolition of the Fire Station, Globe House and part of the existing Wolsey Place Shopping centre)

Local Authority
Woking Borough Council
Type
Approval (Discharge) of conditions (Discharge of Conditions)
Decision
Approved (Permitted)
Application Validated
25/02/2022
Extension Erection Demolition Construction Residential Flat Shop House