Former Filling Station On The A40 Windrush Gloucestershire
Compliance with Condition 18 (noise verification) of permission 17/02435/OUT (Variation of Conditions 4 (plan numbers), 6 (parking provision), 8 (contamination), 9 (soakaways), 10 (foul water disposal) and 11 (surface water disposal) of permission 13/02463/OUT - Development of petrol filling station, restaurant and associated parking and access (Outline application) and completion and conversion of partially constructed motel building to form 16 apartments (detailed proposals))
The Kilns Warley Street Great Warley Essex CM13 3LB
Discharge variation of Condition 5 (hard and soft landscaping) of application 18/01017/FUL (Conversion of existing Listed Building to form 4 no. new apartments, the demolition of its associated annexe building and separate outbuilding and their replacement with new residential development comprising 5 no. dwellings and associated development).
Village Farm House Wilstead Road Elstow Bedford Bedfordshire MK42 9YD
Conversion of agricultural barns to three dwelling units - variation of condition 1 of planning permission 98/01025/FUL to allow a further period for commencement of development. Discharge of condition 16 of planning permission 03/00186/S73 - (external lighting)
Former Elizabeth Shaw Chocolate Factory Part Of Ground Floor And First Floor Of Reception Building (Block C) Greenbank Road Easton Bristol BS5 6EL
Application to approve details in relation to condition 8 (Ecological Mitigation Strategy) of permission 18/00590/X Application for variation of condition number 8 (Ecological mitigation strategy) attached to planning permission 15/06400/F (Granted on appeal reference APP/Z0116/W/17/3166851) for mixed use development comprising conversion of existing remaining buildings (labelled Blocks C, D and F) and erection of new buildings to provide: 135 dwellings (91 apartments; 44 houses) (Blocks A, B, D, E, F, G and terraces); 485 sq m Class B1 floorspace (Block D); 726 sq m of commercial floorspace (Use Class B1/A1/A2) (Blocks B and C); 332 sq m of flexible community/business/health/leisure floorspace (Class B1/D1/D2) (Block C); 412 sq m flexible Class A3 or A4 floorspace (Block D); and associated accesses including a new pedestrian/cycle link onto the Railway Path, parking and landscaping. (Major Application)
Former Filling Station On The A40 Windrush Gloucestershire
Compliance of Conditions 5 (sample panel of walling and roofing), 6 (sample panel of render), 8 (finished colour for windows/doors), 11 (site investigation works, parts 1 and 2), 14 (Foul Drainage Strategy), 15 (Surface Water Strategy), 17 (Scheme to protect dwellings from external noise/ventilation) and 20 (Details of estate roads/access) re application 17/02435/OUT (Variation of Conditions 4 (plan numbers), 6 (parking provision), 8 (contamination), 9 (soakaways), 10 (foul water disposal) and 11 (surface water disposal) of permission 13/02463/OUT - Development of petrol filling station, restaurant and associated parking and access (Outline application) and completion and conversion of partially constructed motel building to form 16 apartments (detailed proposals)
80 High Street Ingatestone Essex CM4 9DW
Discharge of conditions 3 (Samples of materials), 4 (Details of proposed new windows, doors, eaves etc), 5 (Hard and soft landscaping scheme), 7 (Written scheme of Investigation) and 8 (Construction Method Statement) of application 19/01693/FUL (Variation of Conditions 2 (Built in accordance), Condition 3 (Samples) Condition 4 (Window/Door details) Condition 5 (Hard and Soft Landscaping), Condition 7 (Cycle/refuse provision), Condition 10 (Archaeological Programme) and Condition 11 (Construction Method Statement) for application 19/01198/FUL (The conversion of a two bedroom flat into 2 one bedroom flats, restoration works of existing building to include re-roofing and fenestration repair. Demolition of existing single storey extension and construction of new single storey extension, and construction of an additional one bedroom single storey dwelling to the rear of the site) to allow phased development - Phase 1: Staff welfare (replacement of single storey rear projection). Phase 2: Conversion of single first floor apartment into two separate apartments including conversion of the outbuildings. Phase 3: The forge (new dwelling to rear), stabilising rear wall and final landscaping).