Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 20/03821/RM: podium landscape scheme (8) in respect of details of reserved matters (scale, layout, external appearance and landscaping) for 300 units in respect Plots E and A (Phase 1a) arranged across buildings from 3 to 12 storeys in height pursuant to condition 5 of planning permission 16/01197/RE3 dated 10 July 2017 for development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). Application includes details pursuant to condition 29 (green procurement plan), condition 63 (biodiverse roof details), condition 65 (Energy statement), condition 86 (wind assessment), condition 71 (cycle parking details) and 73 (car parking details) of the above permission.
Meridian Water Willoughby Lane And Meridian Way London N18
PARTIAL DISCHARGE PLOT E1.1: Details pursuant to Ref: 16/01197/RE3 for verification report (11) verification report underlaps areas (40) drainage and suds implementation (44) in respect of the development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 16/01197/RE3: eradication strategy of invasive species (62) in respect of development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Land At Harlequin Office Park Fieldfare Emersons Green Bristol South Gloucestershire BS16 7FN
Discharge of condition 8 (Hotel Travel Plan) attached to planning permission P19/8333/F. Erection of mixed-use development comprising of 1no. 90 bedroom Hotel (Class C1), 1no. Restaurant/Bar (Class A3/A4) and 1no. Coffee Shop with Drive Thru Facility (Class A1/A3) with parking, landscaping and as...
The Straight Southall UB1 1QX
Details of a remediation validation/verification report in part pursuant to condition 38 (Phase 3 only) of planning permission ref: 171562VAR dated 16.10.2017 for "Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical (height differences ranging between minus 4.5m and plus 17.5m) parameters and the locations of ground and upper floor uses; with an amendment to the
Part Of The South Acton Estate Acton London W3 8RF
Submission of a construction management plan in pursuant to condition 8 (Central Plaza element only) of planning permission ref: 160794VAR dated 09/12/2016 for 'Minor material amendment application for variation of conditions 3 (approved drawings), 18 (tree protection), 28 (Lifetime Homes), 31 (BREEAM), 36 (provision of Central Plaza in construction programme) and 42 (non-residential floorspace) of outline planning permission P/2012/0708 dated 13/08/2012 (as amended by P/2014/2142 and P/2014/6303) to facilitate minor changes to building heights, development zones, ground floor uses and floorspaces, phasing, public open space for Phase 6 and tree retention strategy for Phases 5 and 6 of the South Acton Estate regeneration masterplan for 'Outline planning application (reserving Appearance; Means of Access; Landscaping; Layout and Scale for later determination) for the continued regeneration of the South Acton Estate comprising of the demolition of buildings locations specified in the site address (including residential units, 521sqm of retail shops, 2,434sqm of community/ office facilities, hotel, garages and associated areas) and the erection of a maximum of 2,350 residential units, a maximum of 1,050sqm of flexible A1 (retail) / A3 (restaurant and cafe) / B1 (office) / D1 (community) uses, of which 600sqm is to be A1 (retail) use, a further 2,348sqm of D1 (community) / B1 (office) space (to include a minimum of 926sqm for provision of a community centre and youth club), energy centre, alterations to allotments, re-sited and enhanced open space and play facilities, landscaping, highway works and 1,128 car parking spaces' (original application was EIA Application).'
The Straight Southall Middlesex UB1 1QX
Details of external noise in part pursuant to condition 79 (Phase 3 only) of planning application Ref: 171562VAR dated 16/10/2017 for 'Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space. Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle..........'
Civic Centre West Paddock Leyland Preston Lancashire PR25 1DH
Discharge of condition 24 - Tree Protection pursuant to application 07/2023/00430/ful for erection of 75 no apartments (being a mix of 1 bed and 2 bed self contained dwellings as part as an age restricted housing development which includes communal living space, cafe bistro and a small retail unit (open to the public) and associated hard and soft landscaping.
60-66 East Street Bedminster Bristol BS3 4HD
Application for approval of details reserved by condition 8 of permission 18/06709/F Phased development comprising demolition of existing retail building and redevelopment to provide 50 flats (Class C3), flexible commercial unit class (Classes A1, A2, and B1) and a retail unit (Class A1). Provision of secure cycle parking, refuse storage and associated hard and soft landscaping (Major).
The Straight Southall Middlesex UB1 1QX
Details of home zone within each residential part plan in part pursuant to condition 72 (Phase 3) of planning permission Ref:171562VAR dated 16.10.2017 "Section 73 application for minor amendment to vary condition 3 (approved drawings) to amend the outline scheme drawings and removal of condition 41 (details of soakaways) of outline planning permission reference PP/2015/4682 dated 18.02.16 for demolition of 22 houses; the remediation of the land and the redevelopment of the site to deliver a large mixed use development including residential, non-food retail, food retail, restaurants, bars and cafes, hotel, conference and banqueting, cinema, health care facilities, education facilities, office/studio units, car park, sports pavilion, an energy centre, multi-storey car park and associated car and cycle parking, landscaping, public realm, open space and children's play space.Full application: new access roads from the Hayes-By-Pass and Southall town centre to the application site for vehicle, cycle and pedestrian access, including drainage and a flood relief pond. Widening of South Road across the railway line, for the creation of a bus lane and three new accesses onto Beaconsfield Road. Two bridges over the Grand Union Canal and Yeading Brook to provide pedestrian and cycle access to Minet Country Park and Springfield Road. The quantum of development remains the same as the original scheme with the exception that the proposed development includes revised positioning of the hotel, supermarket and banqueting hall; the removal of the multi-storey car park to be replaced by basement car parking spaces; the removal of the east/west bus and taxi route through the Civic Square to be replaced by a dedicated pedestrian route and use for emergency vehicular access; proposed changes to the horizontal and vertical (height differences ranging between minus 4.5m and plus 17.5m) parameters and the locations of ground and upper floor uses; with an amendment to the spatial