The White Hart 15 High Street Halstead Essex CO9 2AA
Extension of existing patio area with concrete block paving, including erection of fence with pedestrian gate. Extension of existing timber pergola across the new length of the patio, and installation of raised flowerbeds around boundary of new area.
The Colourwheel Montessori Nursery Denton Crescent Black Notley Essex CM77 8ZZ
Erection of Timber-framed modular building for use as outdoor classroom and installation of acoustic fencing along the southern boundary.
Land South Of Halstead Road Earls Colne Essex
Change of use of land to residential curtilage (Plot 1 and 6 of 20/02205/REM) and the erection of a 1.8m boundary wall and 1.8m close boarded fence.
Land Adjacent Butlers Wood And Waldergrave Wood West Of A131 (In The Parishes Of Bulmer And Twinstead) Sudbury Road Bulmer Essex
A new 400/132 kilovolt (kV) Grid Supply Point (GSP) substation including two supergrid transformers, associated buildings, equipment and switchgear, a single circuit cable sealing end compound, a new permanent vehicular access to the public highway, associated landscaping (including boundary fencing, an area for Biodiversity Net Gain, and landscape mounding) and drainage
Eyston Hall Otten Road Belchamp Walter Essex CO10 7AJ
Alterations to brick boundary wall, demolition of planters to create new gateway and adaptation of fencing to extend driveway into adjacent farmyard.
St Andrews Churchyard Church Road Hatfield Peverel Essex
Erection of fencing, along the western boundary of the churchyard.
Countryside Leisure Ltd Maldon Road Hatfield Peverel Essex CM3 2JP
Retention of 2.1m high fencing along south and east boundary of the site
Braintree College Further Education Church Lane Braintree Essex CM7 5SE
Demolition of existing college buildings, structures and facilities and the erection of a 75 bedroom care home and 19 No. age-restricted LifeLong Homes for those 55 years of age and over (and/or those living with, or supporting someone with a disability), alteration to access; supporting site infrastructure including sub-station, visitor parking, hard and soft landscaping, fences, boundary screening and SuDS; new public access to an established open space; widening of public footpath along Church Lane to improve pedestrian access.