Daniel House And Mersey House (Former Daily Telegraph Building) 131 - 141 Fleet Street London EC4A 2BJ
Refurbishment and extension of the building to create additional floorspace with roof terrace for Class E use; erection of a pavilion structure at roof level; installation of new terrace areas with associated landscaping and balustrades; extension of existing plant enclosure; installation of plant equipment and kitchen extract duct; alterations to facade, including works to clock face on Fleet Street, and at ground floor level; alterations and extension to existing windows and vitrines; provision of new ancillary facilities and other associated works.
Temple Chambers 3 - 7 Temple Avenue London EC4Y 0HP
Refurbishment of lower ground and ground floors of the building, comprising: (i) the installation of 2no. replacement entrance doors and the refurbishment of 2no. entrance doors; (ii) alteration to the existing ground floor railings including the installation of 2no. gates; (iii) the installation of an external staircase to the lower ground floor level and external platform lift; (iv) the infilling of 1no lightwell with a new roof and associated landscaping at ground floor level; (v) the installation of external plant condensers within the lower ground floor lightwells and internal vaults and associated works; and (vi) alterations to cycle storage and refuse storage.
Cripplegate House 1 Golden Lane London EC1Y 0RR
Alteration and extension of the existing office building (Class Eg(i)) incorporating a local community/cultural space (Class Eg(i)/F2) at ground floor; to include additional floorspace through upward and infill extensions (+2485sq.m GIA uplift); altered and additional entrances; creation of office amenity terraces and plant enclosures; facade alterations including urban greening; new landscaping; and associated works.
Princes Court 7 Prince's Street London EC2R 8AQ
Partial demolition, alteration and extension to provide office and flexible office/restaurant floorspace (Class E) at ground, lower ground and basement level and office floorspace (Class E) on upper levels comprising (i) demolition of level 7 and plant enclosure above; (ii) creation of new office floorplates at levels 7, 8, and 9 and plant enclosure above; (iii) retention of lower ground and basement level and concrete frame at ground to level 6 with replacement front and rear facades; (iv) remodelling of office entrance, associated external alterations at street level including creation of new entrance; (v) creation of external terraces and associated hard and soft landscaping; (vi) provision of ancillary cycle parking and associated facilities; and (vii) other ancillary works.
Woolgate Exchange 25 Basinghall Street London EC2V 5HA
Extensions, alterations and change of use including: (i) Change of use of part basement and part ground floor from sui generis (drinking establishment) to flexible Class E (retail/restaurant/office) and sui generis (drinking establishment) and extension at ground floor; (ii) single and double storey extensions at roof level to form new Class E(g) use (office); (iii) double height extension at ground floor to form enlarged office entrance at Basinghall Street; (iv) use of office fronting Coleman street for flexible Class E (retail/restaurant/office) and associated alterations to building entrances with open arcade and retail frontages; (v) creation of terraces to Basinghall Street, the south elevation, and at roof level and changes to existing terraces including installation of structures; (vi) hard and soft landscaping at Basinghall Street and Coleman Street; (vii) provision of ancillary external and internal cycle parking and facilities; (viii) installation of plant at roof level; and associated works.
St Brides House 10 Salisbury Square London EC4Y 8EH
Refurbishment and extension of the building including the: i) Recladding of fifth floor and addition of plant enclosure at roof level(Class E); ii) creation of accessible terraces at level five; iii) installation of projecting balconies to the northern elevation at levels three to four; iv) creation of single storey infill extension on the western elevation; v) reconfiguration of the office entrance; vi) reconfiguration of the loading bay; vii) new hard and soft landscaping and other ancillary works.
Thavies Inn House 3 - 4 Holborn Circus London EC1N 2HA
Demolition of the existing building at 1-6 Holborn Circus (known as Thavies Inn House) and the erection of a ten storey Class E building for office use with Class E retail use at part ground floor level with works to include reinstatement and new pedestrian routes through the site; hard and soft landscaping works including removal and replacement trees within the public highway, and creation of pocket park in Thavies Inn; widening of the footway on St Andrew Street; and other works incidental to the proposed development.
61 - 65 Holborn Viaduct London EC1A 2FD
Redevelopment of the site for a new building comprising two basement levels, lower ground, ground plus 12 upper floors including purpose built student accommodation and associated amenity space (Sui Generis), flexible cultural / community use at part ground and lower ground floor levels (Sui Generis), a publicly accessible roof terrace, a pedestrian route through the site, hard and soft landscaping, together with ancillary plant and servicing; and associated enabling works.
1B Snow Hill Court London EC1A 2EJ
Change of use from office (E) use class, to flexible Class E and/or C2 Residential Institution, alterations and refurbishment of listed building (including partial demolition / replacement of existing roof structures and rooflights with new) to form Rough Sleeper Assessment Centre. Installation of new external plant and changes to landscaping including creation of covered seating area, installation of new bike stands and access gate.
Finsbury Circus Gardens Finsbury Circus London
Alterations to Finsbury Circus Gardens including the construction of a new park office building, pavilion cafe (Use Class E) and gardeners storage yard, the re-instatement and re-location of the listed fountain, relocation of an unlisted fountain, demolition of the bandstand, hard and soft landscape works including removal of 12 trees and 4 trees to be crown lifted.