Site 18 - 19 Whinfield Way Highfield Rowlands Gill Gateshead NE39 1EH
Change of use of land to storage and distribution (Use Class B8), erection of perimeter fence and gates and erection of storage containers and container office including solar panels to roof (amended description 14.11.2022) (additional/amended plans 14.11.2022, 29.12.2022, 24.07.23, 26.07.23, 20.10.23 and 03/11/23).
Tyne Bridge House Bottle Bank Gateshead
Proposed split-level office development (A2 and B1a uses) on two levels, with reception and meeting room at a lower level to the main office accommodation and a roof terrace, providing 522 sqm of office space and ancillary accommodation, demolition of existing sub-station, alterations to existing access steps and perimeter parapet walls, with the insertion of new fenestration on the northern and eastern elevations, re-alignment of the refuse store fence, and western wall and windows, and installation of planting strip at Bottle Bank (amended 02/10/20).