Chadlington Manor House East End Chadlington Chipping Norton Oxfordshire OX7 3LX
Alterations to main dwelling including construction of replacement porch, works to roof to include replacement and additional dormer windows. Re roofing of existing gardeners room. Erection of a greenhouse, a Summer house and an agricultural barn along with the refurbishment of the existing stables and garage. Refurbishment of existing lake with the installation of a Water Source Heat Pump and the addition of solar panels to the South side of the lake and associated works (Amended Plans).
Whiteways Technical Centre Enstone Chipping Norton Oxfordshire OX7 4EE
Demolition of an existing single storey timber clad gymnasium building. Construction of a two storey extension to the existing two storey ESO Building, including undercroft car parking, roof mounted plant and photovoltaic panels, ground level external plant area, alterations to the existing building envelope to form roof access, rooflights, windows and doors; and associated works including construction of an earth bunded drainage infiltration basin in the southern section of the site. The extension is to contain improved replacement gymnasium and welfare facilities, office space, laboratories, storage space, and operational consolidation.
Aspley House Wood Lane Hailey Witney Oxfordshire OX29 9XB
Alterations to roof and fenestration changes to existing dwelling along with demolition of garage. Construction of a new dwelling and associated works.
Abingdon And Witney College Holloway Road Witney Oxfordshire OX28 6NE
Refurbishment of the Buttercross Building including works to walls, roof and windows. Addition of new external fire escape stairways.
6 Lodge Road Hanborough Business Park Long Hanborough Witney Oxfordshire OX29 8LH
Alterations to include changes to doors, fenestration and roof lights with the provision of additional first floor office space.
St Michaels And All Angels Church New Road Great Tew Oxfordshire OX7 4AG
Erection of single storey extension to North elevation with glass linked entrance lobby and improved access with upgraded paths and the discharge of samples for stone walling, zinc roofing and window details.