Land Off New Road Swanmore Hampshire
Residential development comprising 60 no. dwellings and 4 no. flats with access from New Road together with car parking, landscaping, public open space and associated works
Spring Meadows Paradise Lane Waltham Chase SO32 2TH
The development is to build a chicken rearing shed and access track. The steel framed barn has been designed to meet the needs of chicken rearing shed.
Willow Cottage Well Road Hundred Acres Wickham Fareham Hampshire PO17 6JT
The proposed development is to consist of a new field shed (9.144m wide by 12.192m long. To replace an existing field shelter.
Land To The West Of Tangier Lane Bishops Waltham SO32 1BU
Temporary planning permission sought for the creation of showroom, sales offices, access and parking arrangements for the Sales Area associated with the wider development of Phase 1 Tangier Lane, B...
Land At Sherecroft Farm Botley Hill Botley Hampshire
HYBRID PLANNING APPLICATION: Development following demolition of existing buildings within conservation area to include 1) outline application (all matters reserved except access) for up to 0.88 he...
North Whiteley Urban Extension Botley Road Curbridge Hampshire
Removal of protected ash tree and installation of surface water drainage and foul drainage connections between development parcels 24 and 27.
Station Mill Station Road Alresford SO24 9JQ
Change of use of second floor within Mill Building to treatment rooms in connection with approved mixed use development of site for restaurant, gym/fitness/yoga/treatment rooms/office space at Stat...
Linden Lea Uplands Road Denmead Waterlooville Hampshire PO7 6HG
Development of 2 dwellings at Linden Lea after demolition of existing dwelling and outbuildings
Hoe Manor Farm Hoe Street Hambledon PO7 4RD
Change of use from agricultural barn to C3 use with the operational development for conversion to a dwellinghouse, a package treatment works and formation of domestic garden.
Down Farm Port Lane Hursley SO21 2JS
Erection of a general purpose agricultural building and associated operational development. For further details, please refer to the Planning Statement enclosed herewith.