Golden Acres Ltd Plocks Farm Liverpool Road Bretherton Leyland PR26 9AX
Section 73 application to vary conditions 2 (approved plans) and 3 (phasing) attached to planning permission 21/00317/FULMAJ (Section 73 application to vary conditions nos. 3 (approved plans), 4 (phasing), 5 (cladding materials), 6 (ground levels) and 30 (cold store plant and noise attenuation) attached to planning permission 15/00888/FULMAJ (Erection of buildings, engineering operations and related development, all within the curtilage of the existing Class B2 production complex, to create: larder (finished product), ingredients kitchen, meat kitchen, fridge, combined heat and power plant (CHP), water storage tanks, odour abatement plant comprising wet scrubber and bio bed anaerobic digestion plant, offices and car park, River Douglas embankment repairs and 5m high acoustic fencing within the complex) to alter the design and phasing of the cold store and supply details of facing materials, levels and noise attenuation) to alter the design of the Meat Kitchen, design and positioning of the Laundry Building and the phasing of these elements.
Land Parcel At 525627 145487 Reigate Road Sidlow Surrey
The proposed development comprises the installation and operation of a ground-mounted solar farm and energy storage system. The solar farm will broadly comprise a series of linear rows (also known as arrays) of photovoltaic (PV) solar modules, together with inverter platforms; control room; DNO station; storage containers; battery storage; security fencing & CCTV; temporary construction compound; and enhanced landscaping & ecological management. As amended on 30/01/2023, 24/04/2023, 18/07/2023, 04/10/2023, 16/10/2023, 18/10/2023, 27/10/2023 and on 16/11/2023
Land South West Of Hospital Cottages Bridge Street Clay Cross
Two storey building for Police SNT (Safer Neighbourhood Team) with associated car parking, external compounds, security fence and gates (Departure from the development plan)
Land To The South Of Clough Road Clough Road BESS Northern Gas Networks Hull S H E D Clough Road Kingston Upon Hull HU5 1SB
The development of a Battery Storage System (BESS) with ancillary infrastructure, security fencing, access, and biodiversity enhancements, to provide balancing services to the local electricity grid, and associated development.
Northumbrian Water Boldon House Wheatlands Way Pity Me Durham DH1 5FA
Demolition of existing entrance and storage building, external building alterations and associated works including new entrance and first floor alterations (permitted development) replacement of windows and doors, alterations to mullions, repair of roof tiles, installation of Air Source Heat Pump and associated compound fence, hard surfacing, installation of 1 no. cycle storage shelter and electric charging, refuse storage area, landscaping, external lighting and CCTV, access ramp and steps, erection of electrical substation, boundary treatments and any other associated infrastructure.
Land To The East Of Street Record Maple Grove Linton On Ouse North Yorkshire
New access road and fence for pedestrians and motorised vehicles, commensurate for an existing residential development.
Totmonslow Farm, Draycott Road, Totmonslow, Upper Tean, Staffordshire, ST10 4JJ
Temporary development of a solar farm with ancillary infrastructure, security fence, access, landscaping and continued agriculture, to generate power to feed into the local distribution network.
Rolls Royce Site Gloucester Road North Filton South Gloucestershire BS34 7QE
Demolition of existing buildings. Erection of a new research and development facility, external plant and tanks, and relocated site recycling centre, together with associated utilities diversions, internal access road realignment, erection of 2.4m-3m high fencing, and hard and soft landscaping.
Land At Welkin Mill Welkin Road Bredbury Stockport SK6 2BH
Development of a grid-scale battery storage project consisting of battery racks, inverters, transformers and other electrical plant equipment connected via an underground ducted cable to Electricity North West's distribution network at the Vernon Park Substation. Erection of secure compound enclosed by a 2.4m high security fence. A 6.0m high ball stopping net will be installed on the Western boundary of the site to prevent any footballs from landng within the boundary of the site from the adjacent football pitches.
Wolsey Place Yellow Car Park Wolsey Walk Woking Surrey
Proposed retention of existing temporary communications equipment consisting of 3no. temporary antennas and 1no. dish pole mounted off freestanding frames on the upper roof, along with 4no. temporary equipment cabinets on a freestanding platform on the car park roof, surrounded by heras fencing and development ancillary thereto