Great Thorndean Farm Gables Slough Green Lane Warninglid Haywards Heath West Sussex RH17 5SL
Part retrospective planning application for a new garage and alternative surfacing to previously permitted driveway and the proposed provision of a new swimming pool. Amended plans and additional information including Heritage Statement received 20.07.2023, to show proposed swimming pool removed and to include change of use of adjoining agricultural land to private garden area. Additional plans received 14.11.2023 showing proposed changes to roof form of garage and replacement of roller shutter doors with side hung timber doors.
Cedar Cottage Ardingly Road Lindfield Haywards Heath West Sussex RH16 2QY
Demolition of existing shed and erection of a detached garage building with room in the roof, extension of existing driveway and change of use of land to enlarge residential curtilage.
Auckland Place 141 - 147 Western Road Haywards Heath West Sussex RH16 3LH
Two storey roof extension to the existing building to create a total of 6no. flats.
17 Station Road Burgess Hill West Sussex RH15 9DE
Internal alteration to ground floor space, rear (South) extension to existing first floor residential flat, conversion & extension to existing roof space at the rear (South) to form new office and new rear stairway access to upper floors
Herontye House Stuart Way East Grinstead West Sussex RH19 4QX
Replacement of the existing Horsham slate covered roof pitches with handmade clay tiles.
25 - 27 Station Road Burgess Hill West Sussex RH15 9DE
Erection of part two storey, part first floor extension to the rear of existing building to form 2no. additional two bedroom residential units following removal of existing rear roof structures. Amended Plans received 04.03.2021.
193B Lower Church Road Burgess Hill West Sussex RH15 9AA
Demolition of the existing single storey dwelling and out-building and erection of 2x 1 bedroom detached single storey dwellings. Additional drainage information of Flood Risk Assessment and Surface Water Drainage Strategy and revised roof plans showing the solar panels received 1st June 2020.