12 And 14 Aylestone Road Cambridge Cambridgeshire CB4 1HF
Joint application to no.12 and 14 for the installation of air source heat pumps, solar panels, extension to existing decking, and roof extensions including, raising the ridge, front rooflights and rear L-shaped dormers that project over the existing outrigger with rooflights. The demolition of the existing conservatory, erection of a ground floor rear extension, first floor side extension and alterations to existing rear bay window to no.12. The demolition of the single storey rear extension, erection of a ground floor side and rear extension, a first floor side extension, a canopy/awning over existing rear balcony, alterations for the fenestration at rear and a pergola to no. 14.
The Pitt Building Conference Centre Trumpington Street Cambridge Cambridgeshire CB2 1RP
Refurbishments and minor alterations including provision of new south turret housing lift shaft, alterations to north turret to create accessible stair, new roof structure with roof access and safety balustrade, provisions of PV panels on north and south wings (west slope), modifications to fenestration, internal alterations and thermal upgrade works
128 Huntingdon Road Cambridge Cambridgeshire CB3 0HL
Two storey rear extension, internal and external alterations and replacement window and doors, following demolition of the existing single storey flat roof extension and bicycle sheds.
32 Ramsden Square Cambridge Cambridgeshire CB4 2BJ
Re-submission of (Approved Drawings) of permission 16/2052/FUL & 19/0520/S73. (New 2 bed dwelling and single storey extension to the existing dwelling) for the addition of an additional first floor rear element to No 32, with gable roof, roof lights and alternations to rear elevation windows and doors.
61A High Street Linton CB21 4HS
Replacement shop door and repainting shopfront and re-glazing with etched glass. Provision of secondary double glazing to shop front and first floor dormer window. Re-rendering external walls over existing pebbledash with wood float finished lime render with bell cast drip and replacement gable weatherboard. Alter verge tiling as necessary to accommodate render thickness at gable end. Application of render finish to fletton brickwork to rear single storey external walls. Installation of improved ventilation with inlet grille and weathered extract through rear roof slope.