Former Watch Tower House And Kingdom Hall Sites The Ridgeway London NW7 1RS
Demolition of existing buildings and structures, and redevelopment of the site including construction of 10no new buildings, ranging from 1 to 5 storeys (plus basement) in height and refurbishment of and extension to Bittacy Cottage - comprising 175 units of specialist older persons housing (Class C2) with ancillary communal facilities, 9no. residential dwellings (Class C3) and a community facility (Flexible Class F1/F2/E) alongside public open space, provision of car and cycle parking, associated landscaping and associated works (SUBJECT TO SECTION 106 LEGAL AGREEMENT DATED 22 DECEMBER 2023)
Eastwood 76 Hendon Lane London N3 1SL
Conversion of Residential Care Home (Class C2) to 4no. self-contained residential flats (Class C3) including two storey rear extension and alterations to side dormer and 3no skylights. Changes to fenestration including blocking up of some side window and door openings. Removal of external rear staircase. Associated parking, hard and soft landscaping, amenity space, refuse and recycling store and cycle storage
Ibsa House The Ridgeway London NW7 1RN
Demolition of existing printworks/factory buildings and redevelopment of the site (to provide a total of 197 residential units) including conversion of the existing IBSA House office building into 61 flats with associated external alterations. Erection of 5 no. new blocks ranging from 3 to 6 storeys in height to provide 136 flats. Provision of private amenity space, communal rooftop terraces, refuse storage, 344 cycle parking spaces and basement and surface level parking for 197 cars. Single storey extension to the existing gate house to provide management/security office. Associated alterations to landscaping and ancillary works
Land Between Broadfields Primary School And Hartland Drive Edgware HA8 8JP
Redevelopment of the site to provide 137 residential units (Use Class C3) comprising 51 houses and 86 apartments ranging from 2-5 storeys, 158 car parking spaces, cycle parking, landscaping, access improvements and other associated development. Extension of the Edgware Eruv to include the site and installation of poles and wire gateway. (SUBJECT TO LEGAL AGREEMENT DATED 1 APRIL 2021)
151-153 High Street Barnet EN5 5SU
Change of use, refurbishment and extension of 153 High Street from Sui Generis (car dealership) to accommodate retail (Class A1) within an extended ground floor unit and 5 No. residential (Class C3) units (2 No. x 1 bedroom apartments, 1 No. x 2 bedroom apartment, and 2 No. x 2 bed mews cottages) accommodated within a two storey rear extension; part-demolition of 151 High Street front extension and refurbishment and change of use of 151 High Street from Sui Generis (car dealership) to 1 No. x 3 bedroom dwelling house (Class C3) including erection of one front dormer window at roof level, reinstatement of front entrance door, various re-arrangements, internal refurbishments, ancillary development and landscaping. Internal alterations to no.151 including replacement of existing internal doors with timber doors, removal of partition wall to kitchen, restoration of panelling, installation of baskets and slips to blocked up fireplaces
Kingmaker House Station Road Barnet EN5 1NZ
The extension of Kingmaker House at roof level of two storeys to the front and part 5 and 9 to the rear to create 43 new residential units including extension to the permitted development units. Re-cladding of the existing building and provision of private and communal amenity space, new public realm and landscaping, vehicle and cycle parking and other associated works.