Clay Hall Days Lane Pilgrims Hatch Brentwood Essex CM15 9SJ
Variation of condition 2 of application 22/00559/FUL (Construction of four detached dwellings) to allow for ground floor front and side windows, conversion of loft space to create two bedrooms with 2x dormers to the front elevation and 1x dormer and roof light to the rear elevation to Plot 2.
Builders Yard 34 Junction Road Warley Brentwood Essex CM14 5JN
Demolition of the existing workshop outbuilding (building A) and existing garages (building C) with extension to the residential curtilage of No.34s rear garden. New front wall fronting the Highway at No.34 to match existing with bin refuge area provision for both dwellings. Conversion of existing commercial building (building B) into a three bedroom two storey detached residential dwellinghouse by raising the ridge of the building plus the addition of front dormer windows and rear facing velux rooflights and alterations to the fenestration.
Builders Yard 34 Junction Road Warley Brentwood Essex CM14 5JN
Demolition of the existing workshop outbuilding (building A) and existing garages (building C) with extension to the residential curtilage of No.34s rear garden. New front wall fronting the Highway at No.34 to match existing with bin refuge area provision for both dwellings. Conversion of existing commercial building (building B) into a three bedroom two storey detached residential dwellinghouse by raising the ridge of the building plus the addition of front dormer windows and rear facing velux rooflights and alterations to the fenestration.