Abbey Barns Duxford Road Ickleton Cambridgeshire CB10 1SX
Two storey extension to Unit 4 and the erection of 2no. new building for office / research and development uses (Use Class E) together with associated car parking, infrastructure and landscaping.
Northstowe House Rampton Road Longstanton Cambridgeshire CB24 3EN
Temporary planning application for a period of five years for a Use Class E(g)(i) office building with ancillary exhibition use (Retention of existing development approved under S/0045/18/FL)
9 High Street Histon Cambridgeshire CB24 9JD
Demolition of single storey workshops. Construction of a two storey rear extension. Refurbishment, re-roofing, and re-cladding of an existing two storey office block. Creation of a Net Zero office development with a single storey front retail unit. New hard and soft landscaping throughout.
Burlington Park Station Road Foxton Cambridgeshire
Demolition of buildings and associated structures, erection of an office and research and development building for Use Class E(g)(i) and E(g)(ii) uses, refurbishment of existing buildings, parking and landscaping, and associated works
Land South Of Coldhams Lane Cambridge Cambridgeshire
Hybrid planning application comprising: For Parcel A: outline application for development of 31,400sqm (GEA) of commercial floorspace, including B8 (storage and distribution),flexible B8/E(g) (office, research, and development and light industrial) and E(g) floorspace; For Parcel B: full application for ecological enhancements through habitat creation and management with restricted public access; For Parcel C (the Lakes): full application for the opening of the Site to public access for passive recreation, alongside delivering ecological enhancements, including landscaping and public open space. (Note for consultation: This application is a resubmission of previously withdrawn application 21/02326/FUL. The proposals differ from the previously withdrawn application in some areas including some of the following: changes to red line boundary, including access along Normans Way up to Coldhams Lane; a change to the mix of uses proposed, to provide a reduction in B8 (storage and distribution) floorspace and an increase in E(g) (business) floorspace; A Land Use Parameter Plan to control the location of permitted uses, including increased separation distances between some adjacent residential properties; introduction of two possible locations for a food / drink kiosk; additional information with regard to management of the lakes (parcel C) and omission of floating islands within the eastern lake).
The Emperor 21 Hills Road Cambridge CB2 1NW
Retention of building frontage facade and introduction of a mixed use development comprising basement and ground floor public house and an office/business Use (Class E(g)) to the rear and on the upper floors along with access, cycle parking and associated infrastructure following demolition of existing buildings.
127 Cambridge Science Park Milton CB4 0GD
Erection of a building for Office/Research and Development use following demolition of existing buildings, and associated infrastructure and works
Land At Babraham Research Campus High Street Babraham Cambridge Cambridgeshire CB22 3AT
Erection of new building for Office/Research and Development use and associated infrastructure and works
The Emperor 21 Hills Road Cambridge CB2 1NW
Retention of building frontage facade and introduction of a mixed use development comprising basement and ground floor public house and an Office/Business Use (Class E(g)) to the rear and on the upper floors along with access, cycle parking and associated infrastructure following demolition of the existing buildings on site.
Trinity Hall Farm Industrial Estate Nuffield Road Cambridge Cambridgeshire CB4 1TG
Erection of four commercial mid-tech buildings comprising Use Class E (commercial, business and service) to provide flexible office, research and development and light industrial uses, and Use Class B8 (storage and distribution) limited to a maximum of 20% GEFA; together with car parking, cycle parking, landscaping, substation and associated infrastructure (following demolition of the existing buildings).