Newbury House 10 - 13 Newbury Street London EC1A 7HU
Change of use at basement, ground, first, second and third floor levels from hotel (Class C1 use) to a flexible use for either Class C1 or Class C3 purposes to provide seven units of accommodation; Erection of a set-back roof extension for a flexible use for either Class C1 or Class C3 purposes to provide two additional units of accommodation (9 in total); External alterations comprising retention and repair of Newbury Street facade, demolition of the rear facade and its remodelling in brick; the addition of two new (fourth and fifth) floors with amenity spaces enclosed by metal balustrades; and the installation of a sedum roof.
1B Snow Hill Court London EC1A 2EJ
Change of use from office (E) use class, to flexible Class E and/or C2 Residential Institution, alterations and refurbishment of listed building (including partial demolition / replacement of existing roof structures and rooflights with new) to form Rough Sleeper Assessment Centre. Installation of new external plant and changes to landscaping including creation of covered seating area, installation of new bike stands and access gate.
120 Fleet Street London EC4A 2BE
Demolition of the existing River Court building at 120 Fleet Street, including part demolition of the basement and the erection of a new building comprising two basement levels and ground floor plus 20 upper storeys (93.15m AOD) including retail, commercial, office and service use (Class E). Creation of new pedestrian routes. Change of use of Daily Express Building from office (Use Class E) to learning and non-residential institutions use (Class F1), retail, flexible learning and non-residential institutions and commercial use (Class E), Alterations to and refurbishment of the existing Grade II* listed Daily Express Building at 120 Fleet Street, including works to detach the building from the River Court with demolition of part of linking floorplate and structure from basement level 01 to level 06, demolition of roof and installation of new roof with associated roof garden, erection of new north facade, retention of south-east curved corner and part demolition of existing east facade from ground level to level 05, erection of new facade and shopfront and associated works.
147 Leadenhall Street London EC3V 4QT
External and internal refurbishment to include works to Grace Hall, remodelling the internal entrance lobby, remodelling the lower ground floor to include provision of cycle storage and cycle facilities (showers/lockers) , renovation of office floors 1-4, creation of new access to an existing terrace at 4th floor level, demolition of existing plant enclosure and installation of new plant within a plant enclosure at roof level. Conversion of mezzanine dining area to ancillary office use involving a change of use from events venue use (sui generis) to ancillary office use (Class E). External facade cleaning and redecoration of all internal spaces.
6 Bream's Buildings London EC4A 1HP
Part demolition and extension of the existing building, associated with change of use from Office (Class E) to Residential Units (Class C3), including extensions to lower ground, ground, first, second and third floors, new fourth, fifth and sixth floors with a roof terrace above, for the creation of 9 residential units with cycle parking, ground floor waste store, plant areas, and other associated works.
2 King Edward Street London EC1A 1HQ
Demolition of twin walkway bridges linking the West and Main buildings with associated alterations to building fenestrations and ground floor layout to West Building, and installation of generator at roof level.
Site Bounded By Fenchurch Street, Mark Lane, Dunster Court And Mincing Lane. London EC3M 3JY
i) Demolition of 41-43 Mincing Lane, 40-54 Fenchurch Street, former church hall and the Clothworkers' Hall and its redevelopment to provide a new building comprising four levels of basement (including a basement mezzanine level), ground, mezzanine, plus part 9, 31 and 35 storeys plus plant containing offices (B1) and flexible shop/financial and professional services/cafe and restaurant uses (A1/A2/A3) at ground floor level; and flexible shop/cafe and restaurant/drinking establishment uses (A1/A3/A4) at levels 10 and 11, including winter garden (Sui Generis); ii) Reprovision of the Clothworkers' accommodation (Sui Generis) within part ground, part first, part second and part third floors and four levels of basement (including a basement mezzanine level); iii) Creation of ground level public access to level 10 roof garden and basement level 1 to Grade II Listed crypt; iv) Dismantling, relocation and reconstruction of the Lambe's Chapel Crypt to basement level 1 and associated exhibition accommodation (Sui Generis) (listed Grade II); v) Alterations to and conservation of the Grade I Listed Tower of All Hallows Staining; vi) Provision of new hard and soft landscaping and other associated works.
Snow Hill Police Station 5 Snow Hill London EC1A 2DP
External and internal alterations together with demolition and new build and associated change of use of existing building from police station (sui generis) to hotel with ancillary uses (Class C1) including: (i) refurbishment of facade to Snow Hill and the retained facade to Cock Lane; (ii) partial demolition, rebuilding and extension to provide a building ranging from 6 to 8 storeys, plus new plant at roof level; (iii) extension of existing sub-basement; (iv) provision of cycle storage; (v) highway works; (vi) greening and other ancillary works.
Seal House 1 Swan Lane London EC4R 3TN
Demolition of the existing building and construction of a basement, ground plus 11 storey building for office use (Class B1) (16,084sq.m GIA), retail use (Class A1/A3) at ground (314sq.m GIA), restaurant use (Class A3) at 11th floor level (708sq.m GIA), a publicly accessible terrace at 12th floor roof level (744sq.m) and public realm improvement works together with ancillary parking, servicing and plant and all necessary enabling works.
100 And 108 Fetter Lane London EC4A 1ES
Demolition of 100 and 108 Fetter Lane and construction of a new building for office use (Class E) and a public house comprising a basement level, ground, mezzanine and 12 upper storeys plus roof plant level, creation of a new pedestrian route and pocket square at ground level, ancillary cycle parking, servicing, plant and enabling works.