73 Gloucester Terrace London W2 3DH
Internal alterations to basement, replacement of windows and doors to front and rear elevation (Part retrospective) (Linked to 23/01073/LBC)
30 - 32 Inverness Terrace London W2 3JA
Installation of air conditioning units to rear and side elevations, rear railings and walkways for fire safety, alterations to tiling at the rear, replacement of uPVC windows with timber windows (part retrospective). ( Linked with 23/01130/LBC).
Flat 1 108 Great Portland Street London W1W 6PG
Replacement of first floor window with a door for access to terrace and replacement of wooden parapet safety railing running between a gap in the brick parapet, with a brick in-fill in the parapet. (Retrospective)
12A Greville Place London NW6 5JH
Erection of two dormer windows in rear roofslope (retrospective).
103B Lisson Grove London NW1 6UP
Rear window replacement, new flat rooflight to the roof access and pipework alterations (part retrospective). Linked to 23/00289/LBC
Flat A Basement 21 Alexander Street London W2 5NT
Alterations to the rear ground floor extension and lower ground floor fenestration (Retrospective).
165 Lanark Road London W9 1NZ
Installation of bird deterrent netting system to roof and rear fire escape; and spikes to windows and guttering to the rear (Retrospective).
Flat 2 124 Gloucester Terrace London W2 6HP
Installation of replacement upvc windows and doors. (Retrospective, Linked with 22/06045/LBC)
Flat E 22 Cleveland Square London W2 6DG
Installation of replacement of windows at fourth floor level. (Retrospective Application, linked with 22/06327/LBC)
Libertys Tudor Building Great Marlborough Street London W1F 7HH
Isolated adjustments to windows and shop fronts, including: upgrading louvre ventilation shafts, improving security by upgrading vulnerable glazing and introducing security bars, locks and secondary glazing to windows, where necessary; installation of security bars over basement lightwell (retrospective); upgrading pigeon deterrents at all levels of the building; replacement of all glazing in the roof lanterns and roof lights; extending and partial replacement rainwater drainage goods; addition of secure access methods to the roof; windows repair off-site; new lighting and CCTV schemes, and associated upgrading of existing electrical infrastructure.