Brick Apartments 7D Woodfield Road London W9 2EF
Variation of condition 8 (operational hours) and details of condition 7 (operational management plan) of planning permission dated 17 February 2021 (RN 20/01986/FULL) for the Variation of condition 1 (approved plans) of planning permission dated 30 April 2019 (RN 18/01481/FULL) which was itself a variation of condition 1 (approved plans) of planning permission dated 01 February 2017 (RN 16/02091/FULL) for the demolition of existing buildings and redevelopment to provide buildings of G+4 and G+13 storeys, providing a mixed use development comprising flexible office use (Class B1) and Healthcare (Class D1), and 74 residential units (including 19 affordable units), with associated basement car parking, cycle parking and hard and soft landscaping from RN 16/02091/FULL to vary drawings to relocate the UKPN Substation from Elmfield Way, to corner the of Elmfield Way and Woodfield Road; Amalgamation of two units (1 x 2 bed, 1 x 1 bed) on the 12th floor of the residential tower, into 3-bedroom unit, 4-bedroom flat on 13th floor changed to a 3-bedroom flat, internal design changes, design details pertaining to condition 28. NAMELY, to vary to infill the existing recessed amenity space on the south elevation of the residential tower (block B) at level 12 and 13 to provide additional internal floor space for the two units located over these levels. NAMELY, to increase the operational hours for health related services to 07.00 and 22.00 Monday to Sunday and to provide details of the operational management plan.
Dev Site At Tot Court Rd Station And 1-23 Oxford St And 157-165 Charing Cross Rd And 1-6 Falconberg Mews London
Variation of conditions 15, 17 of planning permission dated 27th July 2022 (RN 22/01385/FULL) for the following development :Demolition of 17-23 Oxford Street and erection of a building comprising part two basement levels, ground plus eight upper floors with ninth floor roof top plant for use as commercial floorspace at part basement, ground and first floors, offices (Class B1) at part basement, ground and first to eighth floors, new public realm landscaping, servicing and access arrangements. (OSD Site A). NAMELY to allow the ground floor Unit 5 to be used for Class E(b) purposes as well as the previously approved Class E(a) use, to allow the food and beverage company to occupy the unit. And to amend the wording of this condition to allow primary cooking on site within Unit 5, as well as the Units that already benefit from Class E(b) use under permission.
Foreign & Commonwealth Office King Charles Street London SW1A 2AH
Removal of condition 15 of planning permission dated 19 July 2022 (RN: 22/02399/FULL) for the: Remodelling of the quadrangle of the Foreign and Commonwealth Development Office (FCDO) Main Building, including the introduction of soft landscaping and associated works. Namely, to remove the requirement to retain the rounded corners of the existing pavement and kerb layout. (Linked with 23/03678/LBC)
St Johns Church Kilburn Lane London W10 4AA
Variation of conditions 1 (and in turn conditions 3, 7, 9, 13, 16, 17, 20) of planning permission dated 21st December 2020 (RN:20/04245/FULL) for the Refurbishment and extension of the Old Vicarage building to convert existing boarding accommodation to provide 5 residential (C3) units; erection of new two storey residential block (plus basement) to the north comprising 4 houses with associated car and cycle parking and landscaping; demolition of sub station and replacement with part single, part two storey school building (Use Class D1) comprising classrooms, ancillary office (Site relates to Bales College). Namely, to add a Phasing Plan to phase the development.
Foreign & Commonwealth Office King Charles Street London SW1A 2AH
Remodelling of the quadrangle of the Foreign and Commonwealth Development Office (FCDO) Main Building, including the introduction of soft landscaping and associated works.
Development Site At Carrington Street Car Park, 51-53 Brick Street, 100 Piccadilly And 1-6 Yarmouth Place London
Variation of Condition 1 of planning permission dated 9th February 2021 (RN: 20/05400/FULL) for, 'Demolition of existing buildings on site and redevelopment to provide up to 30 residential units (Class C3), office floorspace (Class B1), gymnasium (Class D2), retail art gallery (Class A1), restaurant (Class A3) and retail (Class A1) floorspace; creation of a new pedestrian link through the site between Yarmouth Place and Carrington Street; erection of buildings either side of the new pedestrian link between 4 and 8 storeys in height excavation to create additional basement accommodation provision of on site car parking, cycle parking and delivery bay on Yarmouth Place new landscaping including improvement works to Yarmouth Place associated alterations'; NAMELY, to make the following amendments to the approved development - Addition of a new courtyard at upper ground level to approved gallery, replacing the courtyard at first floor level; Adjustment of public staircase size; Adding flush rooflight to new pedestrian route; new gym entrance at LGF; relocating photovolatics to 6th floor roof; metal balustrade to terraces; new balustrade to 1st floor terrace; changes to office core at all levels as well as roof level, including new ductwork in plant enclosure; French windows to replace single doors to rear office facade and Residential cycle store relocated to lower ground floor level. (Application under Section 73 of the Act). (Revisions 12.11.2021 - waste and highways issues)
Development Site At 87 - 125 Cleveland Street London
Variation of condition 1 on planning permission dated 13th May 2021 (RN 19/09996/FULL) which varied condition 1, and removal of conditions 20, 26 and 27 of planning permission dated 10 November 2015 (RN: 14/11837/FULL) for the: Demolition of existing building and redevelopment to provide a building of three blocks (Block A comprising ground and nine upper floors, Block B ground and three upper floors and Block C ground and three upper floors) with basement and smaller sub-basement below and each separated by landscaped areas. For a mix of up to 105 residential units, provision of a mix of retail (Class A1), restaurant (Class A3), drinking establishment (Class A4), office (Class B1), non-residential institution (Class D1) and assembly and leisure (Class D2) floorspace and associated landscaping, and provision of 46 residential parking spaces and associated plant space across sub-basement, basement and ground floor levels ( amended description of development pursuant to NMA's 20/2/2020 RN 19/10073/NMA) NAMELY to allow i) the installation of additional plant at roof level on Block B and ii) amalgamation of retail units in connection with the use of ground floor units 3B, SA, SB, 6 and basement floor of unit 6 as commercial offices. Application is made under S73 of the Act
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works NAMELY, to allow alterations including alterations at ground floor level and at 10th floor roof level including a new roof top room, roof terrace and alterations to plant enclosure at 19-35 Baker Street, new risers at 3rd floor to roof level at 30 Gloucester Place, introduction of increased flexibility to the commercial units across the ground floor and to remove the existing tree situated directly to the front of the newly approved entrance and replace it with a new tree to the south-west corner of Gloucester Place.
87 - 89 Cleveland Street London W1T 6PJ
Variation of condition 1, and removal of conditions 20, 26 and 27 of planning permission dated 10 November 2015 (RN: 14/11837/FULL) for the:Demolition of existing building and redevelopment to provide a building of three blocks (Block A comprising ground and nine upper floors, Block B ground and three upper floors and Block C ground and three upper floors) with basement and smaller sub-basement below and each separated by landscaped areas. For a mix of up to 105 residential units, provision of a mix of retail (Class A1), restaurant (Class A3), drinking establishment (Class A4), office (Class B1), non-residential institution (Class D1) and assembly and leisure (Class D2) floorspace and associated landscaping, and provision of 46 residential parking spaces and associated plant space across sub-basement, basement and ground floor levels ( amended description of development pursuant to NMA's 20/2/2020 RN 19/10073/NMA).
Development Site At 52 To 73 Wilton Road London
Demolition of existing buildings and redevelopment to provide part 4, part 5 and part 6 storeys building and 2 basement levels for a mixed-use development comprising office floorspace (use Class B1a) at part ground and first to fifth floor levels with terraces at 3rd, 4th and 5th floor levels, 5 residential flats (4 x 2 bedroom flats and 1 x 3 bedrooms flat) with balconies (use Class C3) at first to third floor levels at the corner with Gillingham Row and retail floorspace (use Classes A1/A3) at ground and basement levels with associated works including installation of plant at roof level and alterations to public realm with hard and soft landscaping and the creation of loading bays.