202-204 Beulah Hill Upper Norwood London SE19 3UX
Amalgamation of existing semi-detached dwellinghouses into one detached single family dwellinghouse. Demolition of the garage of no.204 and erection of a single-storey 6m rear extension, front porch extension and two two-storey side extensions. Replacement of existing hipped roof and removal of chimneys, installation of crown roof with front gables, 13no rooflights and 2 recessed balconies to rear roofslope. New boundary wall with pedestrian gate. Replacement of windows and rendering of external walls. Associated cycle and refuse storage and soft and hard landscaping.
58 Reddown Road Coulsdon CR5 1AX
Demolition of single storey detached side garage and erection of a two/storey (with lower ground floor level and roof accommodation) building comprising 3 self-contained flats; new vehicular crossovers to facilitate vehicular parking for the host and new property; hard and soft landscaping; land level alterations; boundary treatment; private/communal/play space; refuse and cycle provision; demolition of single storey side conservatory extension and partial two storey side extension to the host property.
15A Russell Hill Purley CR8 2JB
Demolition of existing single storey detached dwellinghouse (with roof accommodation) including demolition of detached garage and erection of a part two; part three storey building (including lower ground levels and accommodation in the roof level) comprising 8 self-contained flats; private/communal amenity and play space; hard and soft landscaping; boundary treatment; reinstatement of existing crossover and new crossover to provide forecourt parking; cycle and refuse provision and land level alterations including raising to the front.
15A Russell Hill Purley CR8 2JB
Demolition of existing single storey detached dwellinghouse (with roof accommodation) including demolition of detached garage and erection of a three storey building comprising 9 self-contained flats; private/communal and play space; hard and soft landscaping; boundary treatment; reinstatement of existing crossover and new crossover to provide forecourt parking; cycle and refuse provision and land level alterations including raising to the front.