Kelmscott House 26 Upper Mall London W6 9TA
External alterations including refurbishment and extension of the garden pavilion building to the rear of the rear garden to provide space for a home gym and office; and associated landscaping works.
4 St Peter's Villas London W6 9BQ
Installation of a black metal handrail to one wall of main front entrance steps; erection of a black metal railing in front of the front lightwell; alterations within the front lightwell to include installation of a replacement timber door to the external store in connection with the creation of a boiler cupboard; installation of new timber framed double glazed bi-folding windows following the removal of 2no. existing timber framed windows, to the rear elevation at lower ground floor level; alterations to the rear garden to include removal of existing timber beams at roof level of the pergola, removal of existing hard landscaping and fountain, removal of pond adjacent to the house and reconfiguring of hard landscaping with new brick paving, and associated landscaping of the rear garden.
Basement Flat 112 Hammersmith Grove London W6 7HB
Erection of a single storey rear extension; erection of a single storey outbuilding in the rear garden to be used as a home office, following the demolition of existing shed; alterations to the rear garden to include, lowering the floor level at the rear of rear garden, repositioning and erection of new external steps following the removal of existing, and associated landscaping.
Caretaker's House Fulham Primary School Halford Road London SW6 1JU
Change of use from a school caretaker's house (Class D1) to a small house of multiple occupation with 6 bedrooms for use by 6 teachers (Class C4); alterations to the building and curtilage to include works to the original railings fronting Halford Road including the installation of a new pedestrian gate on the Halford Road elevation and replacement of an existing window to the front elevation at ground floor level with a new entrance door; bricking up of the existing entrance door to the property from the playground on the east elevation; removal of gate along southern boundary to school playground from yard area and bricking up of entrance point; and landscaping works to the front garden area.