Flat Block 126-137 Felmongers Harlow Essex
External refurbishment and fire remedial works. Block entrance doors. Windows. Stairwell glazing. Refuse store doors. Communal floor vinyl replacement. Fascia and soffits. Flat roof to refuse store. AOV installation to pitched roof. Internal and external decorations.
The Friars Paycock Road Harlow Essex
Remedial works in relation to 1-10 The Friars, including replacement of doors, windows and timber picket fence, raising of balcony guarding, fire precautionary works and re-concreting of the rear yard
Flat Block 19-35 Peterswood Peterswood Harlow Essex
Replacement of the pitched and flat roof coverings, replacement of shiplap wall cladding with HardiePlank VL weatherboard cladding system and replacement of an existing timber window (1no.) with new uPVC window to match existing adjacent windows to the property.
Flat Block 45-49 Five Acres Harlow Essex CM18 6UY
Cladding replacement works, window replacement works and new pitched roof works (Amended description)
The Green Man Hotel Mulberry Green Harlow Essex CM17 0ET
Proposed disabled access ramp and steps, installation of one new window to ground floor and replacement of all existing metal frame windows with double glazed UPVC windows and new pathway from car park.
Flat Block 38-42 Five Acres Harlow Essex CM18 6UY
Cladding Replacement Works, Communal Door Replacement Works, Window Replacement Works, External Insulation Works to Exposed Concrete Frames, & New Pitched Roof Works (Amended Descripton).
Arctic House River Way Harlow Essex CM20 2DP
Removal of existing wall and roof cladding, to be replaced with new wall and roof cladding, with new fenestration.
Flat Block 198-209 Spencers Croft Harlow Essex
Replace timber refuse and personnel doors with powder coated louvred steel doorset. Replace existing Georgian wired panel balcony balustrade with aluminium/steel powder coated vertical infill bar balustrade. Replace single/double glazed timber and plastic framed fenestration, balcony screens / door openings replaced with white plastic framed double glazing. Replace pitched felt roof covering with Bauder built up felt warm roof insulated system which will result in max. 150mm increase in roof / ridge height. Replace existing metal framed roof lantern with aluminium framed powder coated patent glazing system to match existing pitch / profile incorporating double glazed units with automated opening vent/s to meet fire risk assessment recommendations. Redundant brick chimneys, flues and terminals to be removed to reduce planned maintenance.
Flat Block 32-43 Spencers Croft Harlow Essex
Replace timber refuse and personnel doors with powder coated louvred steel doorset. Replace existing Georgian wired panel balcony balustrade with aluminium/steel powder coated vertical infill bar balustrade. Replace single/double glazed timber and plastic framed fenestration, balcony screens / door openings replaced with white plastic framed double glazing. Replace pitched felt roof covering with Bauder built up felt warm roof insulated system which will result in max. 150mm increase in roof / ridge height. Replace existing metal framed roof lantern with aluminium framed powder coated patent glazing system to match existing pitch / profile incorporating double glazed units with automated opening vent/s to meet fire risk assessment recommendations. Redundant brick chimneys, flues and terminals to be removed to reduce planned maintenance.
Stort Tower Great Plumtree Harlow Essex
External works including the replacement of existing windows with new louvred AOV's and replacement of an existing window at the head of the stairs with a new louvred AOV.