Land At Butt Lane (Apple Tree Lane) Laceby North East Lincolnshire
Variation of Condition 2 (Approved Plans) following application DM/0176/14/FUL (Erection of 68 dwellings including garages, access road, mini roundabout and landscaping) for amendment to house types, positioning and garages and install pumping station
Land At Church Lane Humberston North East Lincolnshire
Variation application of condition 2 (Approved Plans) as granted on DM/0036/19/FUL (Erect 5 detached dwellings with detached double garages to include landscaping and access) to amend boundary treatment and hedge planting, location of rainwater harvesting tank, garage types and amendments to the house types of plots 1, 2, 3, 4 and 5 (Amended Certificates)
Toll Bar Farm Louth Road New Waltham North East Lincolnshire DN36 4SA
Variation of Conditions 1 (Time Limit and Approved Plans), 4 (Surface Water Drainage), 6 (CMP), 7 (Surface and Access), 8 (Wheel Cleaning), 9 (Landscaping), 11, 12 and 13 (Contamination) as granted on DM/0635/17/FUL (Hybrid application to demolish an existing farmhouse and barn and erect 3 dwellings (Full). Outline application to erect 3 dwellings with access to be considered (Outline)) for revision to house types for plots 1, 2 and 6
Land Off Hornbeam Drive Healing North East Lincolnshire
Variation of condition 2 (Plans) following application DM/0439/15/FUL (Erection of ten dwellings & garages with associated boundary treatments, landscaping & vehicle access from Hornbeam Drive, Healing) for revision to house types for plots 1 and 2 (AMENDED PLANS)
Cooperage East Street Grimsby North East Lincolnshire
Variation of Condition 2 (Approved Plans) attached DM/0421/19/FUL (Removal of Condition 20 (Security) as granted on DM/0921/18/FUL (Conversion and alterations of disused brewery to form 20 apartments and the erection of 2 dwellings with parking and associated works)) including the retention of the existing roof pitches, part rendering of the rear elevation, amendments to the front entrance and demolish and rebuild the southern wing and Details in Discharge of Conditions 3 (Surface water), 4 (Highways management details), 5 (Highways details), 6 Construction management plan), 8,9,10 and 11 (Contamination), 13 (Ecology), 14 (Network rail), 15 (Cooperage details), 16, (Town house details), 17 (Soft and Hard landscaping), 18 (Archaeology) and 19 (Water) (AMENDED DETAILS/PLANS REC)