Land Parcel At 525627 145487 Reigate Road Sidlow Surrey
The proposed development comprises the installation and operation of a ground-mounted solar farm and energy storage system. The solar farm will broadly comprise a series of linear rows (also known as arrays) of photovoltaic (PV) solar modules, together with inverter platforms; control room; DNO station; storage containers; battery storage; security fencing & CCTV; temporary construction compound; and enhanced landscaping & ecological management. As amended on 30/01/2023, 24/04/2023, 18/07/2023, 04/10/2023, 16/10/2023, 18/10/2023, 27/10/2023 and on 16/11/2023
Hillside Farm Lancaster Road Heaton With Oxcliffe Morecambe Lancashire LA3 3ET
Erection of 100MW energy storage facility including 50 energy storage battery units within steel shipping containers, and ancillary development including substation, transformers, transformer compound, underground cabling, inverters, switchgear, control/switch room, office/site store building, creation of hardstanding, erection of 3m security fencing, access gates, seven 3m CCTV masts and associated balancing pond, landscaping, access track and parking and the change of use of existing farm house and farm building to ancillary offices
Totmonslow Farm, Draycott Road, Totmonslow, Upper Tean, Staffordshire, ST10 4JJ
Temporary development of a solar farm with ancillary infrastructure, security fence, access, landscaping and continued agriculture, to generate power to feed into the local distribution network.
Land East Of Rutton Farm Rull Lane Whimple EX5 2NX
Construction and operation of a ground mounted solar farm, with permission being required for 40 years, comprising solar arrays, equipment housing, sub-station, fencing, ancillary equipment, landscaping and associated development
Land At Bowders Farm Haywards Heath Road Balcombe West Sussex
Erection of a 30m high lattice mast supporting two headframes. Installation of 12 no. antennas on both headframes. 16 no. Radio equipment cabinets. Creation of a dedicated compound secured by 1.8m high mesh link fencing and an access gate measuring 15m x 8m. Compound is to be levelled. Installation of 1 No. shared metre cabinet. New access track from Haywards Heath Road, 3m wide and extending along the farms site boundary. Other ancillary development thereto including RRUs, BOBs and MHAs.
Land To East Of Court House Farm Marsh Lane Easton-in-Gordano
Development of the site for port-related uses. Provision of hardstanding for storage of cargo (e.g. motor vehicles) in transit through Royal Portbury Dock with associated infrastructure, including security fencing, lighting, CCTV, surface water drainage, landscaping/planting, and vehicle access from Marsh Lane. The operational area will be set within existing hedgerows and field boundaries around the periphery of the site, which will be retained and enhanced as part of the proposals, including the Land East of Court House Farm Local Wildlife Site in the eastern most field.
Higher Hawkerland Farm Sidmouth Road Aylesbeare Devon EX5 2JW
Proposed solar farm development with permission being required for 40 years, comprising solar arrays, equipment housing, sub-station, fencing, CCTV, ancillary equipment, landscape and biodiversity enhancements.
Kerry Hill Farm, Eaves Lane, Armshead, Staffordshire, ST2 8NA
Change of use from agricultural field currently used as grazing land for horses to use as a dog exercise field. The area of development will utilise a previously fenced paddock used for grazing of horses which will result in no physical changes to existing boundary hedges and fences which have been in place for agricultural purposes for the past 40 years.
Totmonslow Farm, Draycott Road, Totmonslow, Upper Tean, Staffordshire, ST10 4JJ
Development of a solar farm with ancillary infrastructure, security fence, access, landscaping and continued agriculture, to generate power to feed into the local distribution network.
Land East Of Main Road Swardeston Norfolk
Construction and operation of Energy Balancing Infrastructure (EBI) comprising energy storage technology, to form up to two areas of modular or containerised structures. To include containerised or modular battery array, transformers and inverter area, switchgear and control room building(s), connection of EBI plant to the Hornsea Three Onshore Converter Station (ONCS), required access and internal roads, drainage systems, perimeter and internal fences, and required external lighting and lightning pylons. Development is located within the Hornsea Three ONCS area as consented by the Hornsea Project Three Offshore Wind Farm Development Consent Order (DCO) in December 2020. The application is accompanied by an environmental statement.