Land On The Orchards Callerton Lane Ponteland Northumberland NE20 9EG
Change of use of vacant land and construction of mixed use development of market square (incorporating food and drink servery, florist, artisan bakery, coffee stall and three street food stands) known as 'The Orchard' comprising of market stalls, street food vendors and retail units, with revised access arrangements and associated parking, landscaping and servicing (resubmission).
Yeovil Motor Co Reckleford Yeovil Somerset BA21 4EH
Re-development of the existing Yeovil Motor Company site comprising of the demolition of the existing showroom, workshop and body shop building. Construction of a new Car Showroom, Workshop, MOT facility and Valet building on the site.
3-9 Carshalton Road Sutton SM1 4LE
Application to vary conditions 1 (approved drawings) and 14 ('Excellent' BREEAM final construction rating) of planning permission Ref: DM2018/01602 for an 'Outline application to determine the appearance, layout and scale of a 6-storey (plus basement) mixed-use development including 3-storeys of commercial space (Classes A1 (retail) & B1 (business)) and 10 self contained flats, following the demolition of the existing 4-storey building' to allow for minor amendments to the approved internal layouts, external elevation/fenestration details and substitution of the wording of 'Excellent' with 'Very Good' for condition 14.
9 High Street Histon Cambridgeshire CB24 9JD
Demolition of single storey workshops. Construction of a two storey rear extension. Refurbishment, re-roofing, and re-cladding of an existing two storey office block. Creation of a Net Zero office development with a single storey front retail unit. New hard and soft landscaping throughout.
Town Centre Car Park King Street Stanford Le Hope Essex
Construction of a mixed use development comprising 245sq.m of retail / leisure / commercial units (within classes A1, A2, A3, A4, A5 and D2) at ground floor level and 32 residential units on upper floors together with an undercroft and surface car park (comprising 55 car parking spaces), access, landscaping and associated works.
Heatons Engineering Quin Street Leyland Lancashire PR25 2TA
Demolition of former engineering works building, construction of a part three, part single storey building comprising training, co-working, office, flexible meeting and exhibition space and a public accessible coffee shop along with the associated development of a new public square, car park and service yard.
Heatons Engineering Quin Street Leyland Lancashire PR25 2TA
Following demolition of existing engineering works building, construction of a three storey building with rooftop plant room comprising ground floor retail / restaurant commercial units and a total of 13 apartments at first and second floor along with the associated development of a new public square and car park
51 - 55A Hough Lane Leyland Preston Lancashire PR25 2SA
Following demolition of 51-51a Hough Lane together with Sovereign House on Newsome Street, construction of a three storey building comprising of a ground floor retail/ restaurant commercial unit and a total of four apartments at first and second floor along with the associated development of a new public square adjoining Hough Lane.
Barn At Ratclyffe Farm Clyst Hydon EX15 2NQ
Proposed demolition of existing barns and silo and construction of 5 no. dwellings, farm shop and associated operational development
Fenwicks 53 - 63 New Bond Street London W1S 1RJ
[DEVELOPMENT SITE 5-17 BROOK ST & 53-63 NEW BOND ST] Variation of conditions 6 (evidence of compliance with the council's Code of Construction Practice) and 16 (provision of sustainability and energy efficiency measures) of planning permission dated 17 March 2020 (RN:19/07746/FULL) for 'Extension to the existing retail department store and offices to deliver additional (Class B1) office floorspace with access from Brook Street, change of use of part retail Class A1 floorspace to Class B1 floorspace, new plant on the roof, new roof terraces on Brook Street and New Bond Street frontages, and other associated works' - NAMELY, to allow a phased development (Phase 1 - to carry out works sufficient to implement the permission, and Phase 2 - the remainder of the approved development), to allow the commencement of Phase 1 prior to submitting a detailed construction method statement (condition 6) and to allow phase 1 to commence prior to the remainder of the works within phase 2, and to approve an updated energy statement (condition 16). (S73 application).