Queen Elizabeth Hospital Gayton Road Queen Elizabeth Hospital Site King's Lynn Norfolk PE30 4ET
Proposed demolition of ancillary infrastructure buildings, construction of a 2-Storey (ground and first floor) discharge lounge building with link extension to the main hospital with additional connecting covered walkway link and construction of a 2-storey (ground and first floor) hospital office building, with associated access, infrastructure and landscaping works (use Class C2)
Mayfield Chambers 93 Station Road Clacton On Sea Essex CO15 1TW
Proposed new 4 storey side extension on Station Road to create 4 x 2 bedroom flats - amendment to apartment layouts and relocation of dormer window and the discharge of external construction material in accordance with Condition 7 of planning approval 21/01573/FUL
7 Needham Road London W11 2RP
Variation of Condition 16, Phase (4) of planning permission dated 15 December 2021 (RN 20/03623/FULL) for the amalgamation of two maisonettes to create a single dwelling house [Class C3], excavation beneath the footprint of the existing building and excavation of part of rear garden at lower ground floor level. Demolition of the existing extension to the rear and construction of a new lower ground and ground floor rear extension. Repair work to the facade, alteration to street frontage in line with the street and landscaping to the rear garden. Installation of acoustically attenuated condenser to the rear garden. NAMELY, removal of Phase 4 part of condition 16 entirely and / or varied to allow for report provided with this application to be acceptable to discharge the condition.
Franklin College Chelmsford Avenue Grimsby North East Lincolnshire DN34 5BY
Variation of Condition 2 (Approved Plans) to increase size of first floor extension with extension at ground floor and Details in Discharge of Conditions 3 (Construction Management Plan) and 5 (Surface Water Drainage) following DM/0730/21/FUL
Coxley Mill Coxley Lane Middlestown Wakefield WF4 4PU
Works to the existing reservoir including the following: 1. Raising of the existing dam. 2. Construction of an auxiliary spillway 3. Construction of a new outlet chamber with low-level side weirs and low-level penstock 4. Extension of the existing discharge point to move further downstream away from the toe of the embankment and the construction of a new headwall. 5. Removal of high-level overflow pipe. 6. Minor improvements to the existing spillway entrance to realign the inlet wingwall. 7. Lowering of the intermediate weir on the main spillway.