9 Arundel Street Portsmouth PO1 1NB
Conversion of first floor offices (Class E) and construction of additional floors to form 9 bed/9 person House in Multiple Occupation; alterations include changes to fenestration and provision for refuse and bike storage.
237 - 239 High Street Acton W3 9BY
Part single part two storey rear extension at No 239 High Street; construction of mansard roof extension with dormer windows and rooflights to front, side and rear elevations at No 237 and 239 High Street to create two self-contained residential units (four in total)(Use Class C3) and office space (Use Class E(g)(i)); associated internal and external alterations; alteration to fenestration involving insertion of additional windows; and provision of refuse and cycle storage
Garage The Crest London NW4 2HN
Extension and conversion of existing garage including construction of a first floor mansard roof extension with 1no. front and 1no. side dormer windows and 1no. rooflight to front to provide office space on ground floor and 1no. studio flat at first floor level
Unit 1 Maple House Winterstoke Road Weston-super-Mare North Somerset
Erection of a single storey front extension to existing shop unit. Erection of single storey infill extension to rear of building and construction of an external staircase to rear of property. Internal alterations to ground floor commercial units and alterations to windows to rear elevation and installation of new windows/doors. Change of use of first floor offices to 1no. two bedroom self-contained flat with alterations to side window to create new entrance and creation of a patio area with railings.
19 - 21 New Street Lancaster Lancashire LA1 1EG
Change of use of mixed use unit comprising of ground floor opticians, first floor offices (class E) and first, second and third floor maisonette (Class C3) to mixed use unit comprising of ground floor retail (class E) and bin/bike store, 1 4-bed maisonette (C4) and 1 3-bed maisonette (C4) on the first, second and third floors, construction of a dormer extension and installation of a roof light to the rear elevation, replacement and repair of windows to the front and replacements doors
Arden House 31 Upper Highway Abbots Langley Hertfordshire WD4 8PP
Construction of part single, part two storey rear extension and alterations and additions to fenestration and rooflights to existing care home to create additional bedrooms and office space
10 Market Place Chipping Norton Oxfordshire OX7 5NA
Part conversion of office space to create two self-contained flats, with associated works to include the addition of roof lights and the construction of a dormer window
Weavers Goudhurst Road Horsmonden Tonbridge Kent TN12 8AY
Demolition of part kitchen extension and flat roofed garage, construction of new kitchen and entrance lobby, construction of new garage with office room, removal of mezzanine floor area and relocation of staircase, formation of ground floor shower room and toilet and new access from lower ground floor, damp prevention to lower ground store by lowering floor, replacement windows, re-roofing, removal of black paint to historic frame externally, re-tile hanging and alterations to existing drive
First Floor Flat 30 Plashet Grove East Ham London E6 1AE
Retrospective planning application for change of use of first floor from offices (Use Class E(c)) into residential (Use Class C3) to create a 2 bed 3 person flat (incorporating existing rear outrigger, construction of a balcony, insertion of side window, replacement of front door to flat and cycle parking).
Whiteways Technical Centre Enstone Chipping Norton Oxfordshire OX7 4EE
Demolition of an existing single storey timber clad gymnasium building. Construction of a two storey extension to the existing two storey ESO Building, including undercroft car parking, roof mounted plant and photovoltaic panels, ground level external plant area, alterations to the existing building envelope to form roof access, rooflights, windows and doors; and associated works including construction of an earth bunded drainage infiltration basin in the southern section of the site. The extension is to contain improved replacement gymnasium and welfare facilities, office space, laboratories, storage space, and operational consolidation.