Golden Acres Ltd Plocks Farm Liverpool Road Bretherton Leyland PR26 9AX
Section 73 application to vary conditions 2 (approved plans) and 3 (phasing) attached to planning permission 21/00317/FULMAJ (Section 73 application to vary conditions nos. 3 (approved plans), 4 (phasing), 5 (cladding materials), 6 (ground levels) and 30 (cold store plant and noise attenuation) attached to planning permission 15/00888/FULMAJ (Erection of buildings, engineering operations and related development, all within the curtilage of the existing Class B2 production complex, to create: larder (finished product), ingredients kitchen, meat kitchen, fridge, combined heat and power plant (CHP), water storage tanks, odour abatement plant comprising wet scrubber and bio bed anaerobic digestion plant, offices and car park, River Douglas embankment repairs and 5m high acoustic fencing within the complex) to alter the design and phasing of the cold store and supply details of facing materials, levels and noise attenuation) to alter the design of the Meat Kitchen, design and positioning of the Laundry Building and the phasing of these elements.
Hillside Farm Lancaster Road Heaton With Oxcliffe Morecambe Lancashire LA3 3ET
Erection of 100MW energy storage facility including 50 energy storage battery units within steel shipping containers, and ancillary development including substation, transformers, transformer compound, underground cabling, inverters, switchgear, control/switch room, office/site store building, creation of hardstanding, erection of 3m security fencing, access gates, seven 3m CCTV masts and associated balancing pond, landscaping, access track and parking and the change of use of existing farm house and farm building to ancillary offices
Land Adjacent To Factory Road And West Of Henley Road Factory Road North Woolwich London E16 2EL
Development of a Bus Garage to accommodate 151 buses, including ancillary six-bay workshop and office building with electrical charging infrastructure, bike storage, bin storage, fuel storage, bus wash equipment and associated paths, fencing, gates and landscaping
Former Ena Shaw Ltd 22 - 26 Duke Street Including Building And Car Park Along Volunteer Street St Helens WA10 2JR
Change of use from department store and ancillary offices (Class E) to a mixed-use development of flexible workspaces (Class E(g)), retail units (Class E (a)), and cafe (Class E (b)). Fenestration amendments. Render to part of the building, external extract to the side, and 1.8m timber fencing (part retrospective).
Hillside Farm Lancaster Road Heaton With Oxcliffe Morecambe Lancashire LA3 3ET
Erection of 100MW energy storage facility including 50 energy storage battery units within steel shipping containers, and ancillary development including substation, transformers, transformer compound, underground cabling, inverters, switchgear, control/switch room, office/site store building, creation of hardstanding, erection of 3m security fencing, access gates, seven 3m CCTV masts and associated balancing pond, landscaping, access track and parking
Greenwise Nurseries Vange Park Road Vange Basildon Essex SS16 5LA
Use of the site as a shipping container storage facility (including ancillary repairs, adaptation and refurbishment of containers) with associated operational development comprising: reprofiling of levels across the site, hardsurfacing, associated buildings/structures (security office and covered area for container repair), acoustic fencing and security fencing around site, improved site accesses, SuDS attenuation basins and landscaping around site (Site comprises Greenwise Nursery for G T Co...
Land North Of A683 And Heysham Substation Lancaster Morecambe Bypass Morecambe Lancashire
Installation of a 200MW energy storage facility, including 122 energy storage units and ancillary development including fencing, substation, transformers, underground cabling, inverters, switchgear, control room, office, storage container, security gates, seven no. 3m high CCTV columns, creation of an access with associated parking, landscaping, swale and balancing pond
Athletics Track At Down Grange Pack Lane Basingstoke RG22 5SN
Development of Seated stand, modular meeting room building, finish line camera gallery and office building, judge and time keeper stand. Erection of 3 metre high security fencing
Units 8 To 11 Northedge Business Park Alfreton Road Derby DE21 4BN
Change of use from B1(a), B1(bc) and B1(c) to up to 1708 sq.m. of general industrial (Use Class B2), storage or distribution (Use Class B8), offices to carry out any operational or administrative functions ( Use Class E(g)(i)), research and development of products or processes - (Use Class E(g)(ii)) and industrial processes (Use Class E(g)(iii)) together with erection of 2.4m high weld-mesh fencing and gates to form storage yard
Biogen Weston-super-Mare Aisecome Way Weston-Super-Mare
Variation of condition 4 (vehicle operating times) of permission 13/P/0725/MMA (Minor material amendment to planning permission 11/P/1579/F, as amended by 12/P/1924/MMA (Proposed replacement of the existing Waste Transfer Station, construction and operation of a new Anaerobic Digestion plant and improvements to the existing Household Waste Recycling Centre, together with ancillary development including new access and egress points on land off Aisecome Way) to allow minor changes to the approved biofilter, re-orientation of the flare and gas plant, amendment to the weighbridge office, alteration to the approved AD building, alteration to fence line around site) to allow HGVs or vehicles carrying waste to enter or leave the anaerobic digestion site from 06:00 instead of 07:00 on Mondays to Saturdays and public holidays with all other hours to remain unchanged