Foreign & Commonwealth Office King Charles Street London SW1A 2AH
Removal of condition 15 of planning permission dated 19 July 2022 (RN: 22/02399/FULL) for the: Remodelling of the quadrangle of the Foreign and Commonwealth Development Office (FCDO) Main Building, including the introduction of soft landscaping and associated works. Namely, to remove the requirement to retain the rounded corners of the existing pavement and kerb layout. (Linked with 23/03678/LBC)
5 Wheaton Road Witham Essex CM8 3UJ
Partial demolition of existing two storey workshop bay incorporating ground and first floor admin and office suites and remodelling to create new office and administrative support areas. Alterations and re-roofing of attached factory and service bays. Removal of single storey later addition to existing workshop and service bay building. Associated landscaping reinstatement and operational development. Application follows earlier part implemented scheme under 21/03147/FUL.
The Leys Coggeshall Road Stisted Essex CM77 8AB
Two-storey side extension, single storey rear extension and remodelling to rear elevation of existing dwelling, erection of garage/cartlodge, erection of farm machinery and vehicle storage barn, demolition of outbuildings, with associated development and landscaping.
Foreign & Commonwealth Office King Charles Street London SW1A 2AH
Remodelling of the quadrangle of the Foreign and Commonwealth Development Office (FCDO) Main Building, including the introduction of soft landscaping and associated works.
Land At St Mary's Complex Waverley Street Bootle L20 4AP
Application for hybrid planning permission for three phased development of SAFE St Mary's complex building, vacant land to the South and East bounded by railway line and canal basin; full planning permission is sought for phases one and two as follows; phase one included the demolition of the existing buildings on site and the development of a three storey arts hub building comprising accommodation for SAFE, flexible office/studio/meeting spaces, day nursery and multipurpose hall space alongside the erection of canal side pods for community use (Use Class E), the remodelling and extension of the existing Lock and Quay public house to create bed and breakfast facility, serviced apartments and commercial/training unit (Use Class E) relocated from existing SAFE complex and associated parking. Phase two includes the development of mixed tenure housing including 41 No. 2 and 3 bedroom, two and three storey townhouses and a four-storey apartment block consisting of 66 No. 1 and 2 bedroomed self-contained apartments with associated parking and public realm works and the erection of a substation. Phase three seeks outline permission in respect of means of access, layout and scale for the development of four storey 80-bed extra care facility (Use Class C2) including community hairdressing salon and cafe with appearance and landscaping reserved for future consideration.
Land North East Of Marl Close Wilford Road Ruddington Nottinghamshire
Residential development of 167 new homes on land south of Packman Dyke together with associated infrastructure, including ground remodelling for flood compensation works, landscaping and public open space, and vehicular access via Wilford Road. Watercourse realignment, ground remodelling and other sustainable drainage measures, landscaping and public open space on land north of Packman Dyke.