The Old House 11 Bradford Street Braintree Essex
Installation of new staircase access to attic spaces. Reconfiguration of bathrooms. Updating of plumbing and heating services. Re-siting of the kitchen. Removal of recent partitions. Replacement of modern fire surrounds. Installation of new and reused panelling. Repairs to roof and installation of paving, landscaping, gates and fences.
2 Wiseman Cottages Tilbury Hill Tilbury Juxta Clare Essex CO9 4JP
Retrospective repairs to thatch roof, chimney stacks, installation of fire wall in loft, installation of kitchen window, replacement of exterior render and pargeting, and oak retaining wall. Part-retrospective and proposed refurbishment to kitchen and bathroom. Proposed replacement of rear door, replacement of existing windows, and erection of pergola, fencing and bicycle store.
Oakleigh House Crabb's Hill Hatfield Peverel Essex CM3 2NZ
Erection of a two-storey side extension, single-storey rear extension with balcony above to replace existing conservatory to main dwellinghouse, installation of new crossover and new driveway area with two sets of electric gates and 1.2m high post and rail fencing to Crabb's Hill frontage, erection of garage/workshop with room in the roof over, and demolition of existing detached garage to rebuild into ancillary annexe accommodation.
112 London Road Braintree Essex CM7 2AS
Erection of a single-storey rear extension, hip-to-gable roof alteration to facilitate first-floor loft conversion with dormer to front and rear, balcony over rear extension, internal alterations, new double garage, new gate and fence, and new skylights to roof.
Eyston Hall Otten Road Belchamp Walter Essex CO10 7AJ
External: Ground floor extension to Staff Wing to form rear loggia entrance and Boot Room with hipped slate roof. Windows and doorways altered but all to match existing; new rooflight. Internal: Alterations to apse of Library, new doorways to the Hall with changes to the ceiling, and rearrangements throughout Staff Wing to provide new dining room and Back Hall and bedroom-bathroom relationships. Other changes to floor-levels, new shelving in the library alterations to fireplaces, new doorway to master bathroom, boxing removed from entrance hall and former dressing room to become shower-room and bedroom. Landscaping: Site entrance relocated and driveway re-routed with new hedges and fencing. Gardens re-landscaped with mixed herbaceous borders new stone-paved terraces and stepped approaches. Concealed tennis court and Summerhouse building. Steps removed from Boiler housing with new brick planter on top.