84 Westgate Burnley Lancashire BB11 1RY
Proposed change of use from a C3(a) residential dwelling to a C4 HMO (House of Multiple Occupation) for no more than 6 people, and removal of external paint/render with repointing to its original state, and insertion of two loft windows.
29 Cross Lane East Gravesend Kent DA12 5HD
Application for a Lawful Development Certificate in respect of the proposed change of use from class C3 to C4 conversion of existing dwelling to six person house of multiple occupancies (HMO) including construction of a dormer window to rear, installation of roof light to front and rear chimney removal.
136 Biggin Hill Upper Norwood London SE19 3HP
Erection of a 3.76m high x 6.45m wide rear extension that projects 3m from the original dwelling house; replacement of the existing dormer with a new dormer, new rooflights in the front roof slope of the original dwellinghouse, and fenestration adaptions (relocation of existing windows.
66A Telscombe Road Peacehaven East Sussex BN10 7UB
Change of use from C3(a) dwelling house occupied by a singe family to C3(b) a single household for six persons and receiving care for people with learning disabilities or mental health problems. Internal works to facilitate the change of use including adapted building services, forming partitions and installing new en-suite shower rooms. Infill of the existing garage door opening as shown to proposed drawings and install of new window to front elevation. New waste water connections to existing drainage on site. Renewal of internal finishes.
73 Ashington Gardens Peacehaven East Sussex BN10 8UG
Change of use from C3(a) dwelling house occupied by a single family to C3(b) a single household for six persons and receiving care for people with learning disabilities or mental health problems. Internal works to facilitate the change of use including adapted building services, forming partitions and installing new en-suite shower rooms to the six proposed bedrooms. Infill of the existing garage door opening as shown to proposed drawings and install of new window to front elevation. New Velux type roof window to the front roof slope. New waste water connections to existing drainage on site. Renewal of internal finishes.