Unit 9 Perrywood Business Park Salfords Surrey RH1 5DZ
The industrial unit has an existing covered canopy, with exposed sides. The main aspect of the works is to glaze and insulate this canopy, providing a more welcoming entrance to the facility. It is also proposed that access to the front entrance is made more accessible, with a level threshold path for visitors. This will result in the loss of two parking spaces, which are relocated on site, as shown in the proposed site plan. To the rear, a small brick building is proposed, creating a contained unit for compressor units, used in manufacturing.