99 Hamilton Terrace London NW8 9QY
Confirmation that the planning permission dated 23.09.2020 under reference 20/04785/FULL for Use of building as a single dwellinghouse (Class C3); excavation of a basement extension under house and part of rear garden; installation of replacement windows and doors; alterations to front forecourt including new garage entrance; alteration and extension to side extensions; alterations to rear lower ground floor terrace; and erection of lift overrun at roof level, has been lawfully commenced and it is lawful to continue with that development.
Development Site At St Albans, Greener House, Samuel House Haymarket, 13-16 Charles II St Haymarket London
Demolition of 2.5 metres by 2.5 metres of slab at first floor level of Samuel House (Confirming lawful implementation of planning permission dated 10 January 2023 (ref. 22/03961/FULL): Variation of conditions 3, 4, 5, 6, 7, 39, 40 and 52 dated 24 June 2020 (RN:19/04480/FULL) for "complete demolition of St Albans House and Samuel House and demolition behind remodelled facades of Greener House and 13-16 Charles II Street to enable the comprehensive redevelopment of the site to provide a single new building comprising basements, ground and mezzanine floors and 7 upper floors, retained and remodelled facades at Greener House and 13-16 Charles II Street for use for Class A1 and/or A3 and/or A4, Class D2 and Class B1 office. Basement tunnel link to 11-12 Charles II Street, associated public realm and highway works and other associated works. Alterations to the facade of the Carlton Cinema"; NAMLEY, to allow a 'phased development' (Phase 1 - to remove an internal floor slab in Samuel House and cleaning of the cinema facade and Phase 2 - the remainder of the approved development), to allow the commencement of phase 1 prior to submitting detailed design and construction method statements (condition 3), completed Appendix A (condition 4), additional CoCP requirements (condition 5), written scheme of investigation (condition 6), detail design and method statements in consultation with TfL (condition 7), site investigation (condition 39), fire strategy for the cinema (condition 40), and written scheme of historic building investigation (condition 52) and to allow phase 1 to commence prior to the remainder of the works within phase 2).