50 Painswick Road Cheltenham Gloucestershire GL50 2ER
Demolition of modern kitchen extension and steps. Removal of roof balcony. Reinstatement of sash windows to rear elevation and reinstatement of casement windows to side elevation. Basement extension and internal alterations.
132 London Road Cheltenham Gloucestershire GL52 6HJ
Demolition of existing conservatory, construction of single storey rear extension and minor internal changes, installation of new sash window
344 Prestbury Road Cheltenham Gloucestershire GL52 3DD
Conversion of boiler room and undercover walkway into utility room and internal corridor. Demolition of 1950's extension and replacement of 1950's windows in single storey element. Proposed conservation roof lights on North elevation of single storey element. Partition wall in dining room to create small snug
Deerhurst 88 Portland Street Cheltenham Gloucestershire
Demolition of existing non-historic rear extension and provision of a new replacement rear extension, replacement dormer window, new roof lights and other internal internal alterations and refurbishments to the building (revised scheme previously approved application ref. 20/00673/LBC)
Flat 7 50 London Road Cheltenham Gloucestershire GL52 6DY
Minor internal configuration involving the demolition of a partition wall to reinstate a currently internally blocked up original window.
7 Lansdown Place Cheltenham Gloucestershire GL50 2HU
The demolition and rebuilding of an existing timber framed conservatory superstructure. The removal and replacement of the existing conservatory floor and its support structure. The dismantling and rebuilding of an existing supporting brick wall. The replacement of two stone window cills. The replacement of existing stone copings. The replacement and repainting of existing render coatings. The repair and repointing of existing brick walling (part retrospective).
Deerhurst 88 Portland Street Cheltenham Gloucestershire
Demolition of existing non-historic rear extension and provision of new replacement rear extension, replacement dormer window, new rooflights and other internal alterations and refurbishments to the building to provide 8 self-contained units.