336 Ben Jonson House Barbican London EC2Y 8NQ
Internal alterations to the bedroom, kitchen and bathroom, including demolition and installation of an internal nib wall, installation of a suspended ceiling and other associated works.
1B Snow Hill Court London EC1A 2EJ
Internal and external alterations to facilitate change of use of building from office to flexible Class E and/or C2 Residential Institution (Rough Sleeper Assessment Centre), including alterations and refurbishment of listed building (including partial demolition / replacement of existing roof structures and rooflights with new); installation of new external plant and changes to landscaping including creation of covered seating area; installation of new bike stands; and access gate.
120 Fleet Street London EC4A 2BE
Alterations to and refurbishment of the existing Grade II* listed Daily Express Building at 120 Fleet Street, including works to detach the building from the River Court with demolition of part of linking floorplate and structure from basement level 01 to level 06, demolition of roof and installation of new roof with associated roof garden, erection of new north facade, retention of south-east curved corner and part demolition of existing east facade from ground level to level 05, erection of new facade and shopfront, demolition of level 06 landing and extension to existing oval staircase to provide access to new roof with new core on north side incorporating new lift between roof top level and basement level 01, installation of new staircase between rooftop level and basement level 02, demolition of mezzanine at basement level 01, removal of internal partitions and associated works.
5 Devonshire Square London EC2M 4YE
Demolition of the existing refuse store located to the rear of 5 Devonshire Square and its replacement with a new structure including green roof and replacement terrace to enclose the refuse yard on Harrow Place.
45 Breton House Barbican London EC2Y 8DQ
Internal alterations and demolition of internal wall around water tank
Scottish Provident Building 1 - 6 Lombard Street London EC3V 9AA
Refurbishment of the first floor level interior comprising (i) demolition of existing redundant lift shaft and stair from basement to first floor and infilling of openings (ii) removal of existing partitions (iii) creation of new WC block (iv) installation of new raised access floor and (v) installation of secondary glazing.
147 Leadenhall Street London EC3V 4QT
External and internal refurbishment to include works to Grace Hall, remodelling the internal entrance lobby, remodelling the lower ground floor to include provision of cycle storage and cycle facilities (showers/lockers) , renovation of office floors 1-4, creation of new access to an existing terrace at 4th floor level, demolition of existing plant enclosure and installation of new plant within a plant enclosure at roof level. Conversion of mezzanine dining area to ancillary office use involving a change of use from events venue use (sui generis) to ancillary office use (Class E). External facade cleaning and redecoration of all internal spaces.
Snow Hill Police Station 5 Snow Hill London EC1A 2DP
External and internal alterations together with demolition and new build associated with the change of use of a police station to a hotel with ancillary uses including: (i) refurbishment of facade to Snow Hill and the retained facade to Cock Lane; (ii) partial demolition, rebuilding and extension to provide a building ranging from 6 to 8 storeys, plus new plant at roof level; (iii) extension of existing sub-basement; and other ancillary works.
Philpot House 2-3 Philpot Lane London EC3M 8AN
Demolition of chimney attached to Grade II Listed 2 and 3 Philpot Lane.
1-5 London Wall Buildings London Wall London EC2M 5PG
Application under Section 19 of the Planning (Listed Buildings and Conservation Areas) Act 1990 (as amended) to vary condition 7 (approved plans) of listed building consent dated 24/09/2020 (19/01346/LBC) to incorporate minor material amendments comprising: (i) reconfiguration of the existing floorplate to partially infill lightwell 05 from basement to level 08; (ii) partial infill of extension of lightwell 04 from level 02-08; (iii) relocation of plant at level 07 and 08; (iv) demolition and remodelling from the existing chimney to core 05; (v) restoration of the balustrade and reconstruction of the dormer window to the southern facade; (vi) extension of the roof terrace and creation of additional terraces at roof level and in the base of the lightwell; (vii) installation of a new treatment to lightwell 05 facade and a mansard roof system; (viii) reconfiguration of access to cycle storage and facilities, including relocation of lifts; and (ix) provision of additional amenities inclusive of cycle parking, showers, lockers and waste storage.