Bay House School Gomer Lane Gosport Hampshire PO12 2QP
LISTED BUILDING APPLICATION - RETROSPECTIVE APPLICATION TO INCREASE HEIGHT OF SCHOOL ROOF ON MAIN BLOCK BY 140MM TO REPLACE EXISTING ROOF AND ATTACHMENT TO LISTED BUILDING (description amended 18.01.2021)
8 Crescent Road Gosport Hampshire PO12 2DH
LISTED BUILDING APPLICATION - INTERNAL AND EXTERNAL WORKS TO INCLUDE INSTALLATION OF REPLACEMENT KITCHEN WINDOWS, WIDEN OPENING AND FIT FRENCH DOORS, GENERAL REPAIRS & DECORATION, INCLUDING CLEANING OF MASONRY, REMOVE SIDE DOOR & WINDOW AND BRICK UP OPENINGS. RATIONALISATION OF WASTE & SOIL PIPES, REMOVE INTERNAL PARTITION WALLS, INVESTIGATE & REPAIR DEFLECTING FLOOR, INSTALLATION OF NEW KITCHEN WITH THE ADDITION OF FORMING NEW OPENINGS IN WALLS, REFURBISHMENT OF BASEMENT, REPAIR AND REPLACE FLAT ROOF TO LINK SECTION AND THERMAL EFFICIENCY MEASURES (ALTERNATIVE PROPOSALS TO LISTED BUILDING CONSENT 17/00073/LBA) (CONSERVATION AREA) (as amplified by e-mail dated 04.01.21)
14 James Lind Avenue Gosport Hampshire PO12 2FB
INSTALLATION OF FRENCH DOORS TO HOUSE, REMOVAL OF KITCHEN CEILING, INSTALLATION OF ROOFLIGHTS TO KITCHEN, INTERNAL ALTERATIONS INCLUDING THE CREATION OF NEW THIRD FLOOR BATHROOM, REPLACEMENT OF MODERN FLUSH DOORS AND ALTERATIONS TO M&E SERVICES TO REMOVE INTERNAL BOXING. ALTERATIONS TO EXISTING COACH HOUSE TO INCLUDE RE-ROOFING, INSTALLATION OF ROOFLIGHTS, NEW TIMBER BOARDING TO EXTERNAL ELEVATIONS, NEW ENTRANCE DOORS, SECONDARY GLAZING, NEW INTERNAL OPENING AND LINING OF INTERNAL WALLS (REVISED SCHEME TO LISTED BUILDING CONSENT 20/00107/LBA) (CONSERVATION AREA)
Priddys Hard Heritage Way Gosport Hampshire PO12 4LE
LISTED BUILDING APPLICATION - (I) INTERNAL ALTERATIONS TO INCLUDE INSTALLATION OF TIMBER BOARDED PARTITION WALLS, INSTALLATION OF NEW ROOF LIGHTS IN SOUTHERN ROOF SLOPE, INSTALLATION OF FLUE IN NORTHERN ROOF SLOPE AND EXTRACTION VENTS IN NORTH/SOUTH ROOF SLOPES, EXTERNAL ALTERATIONS TO INCLUDE FIXING OPEN TIMBER GABLE END DOORS IN EAST ELEVATION AND INSTALLATION OF OPENING ALUMINIUM GLAZED DOORS AND EXTERNAL REPAIRS TO BUILDING U, (II) INSERTION OF DOOR AND FANLIGHT IN NORTH-EASTERN ELEVATION TO BUILDING M, (III) INSTALLATION OF OPENABLE TIMBER DOUBLE DOORS IN SOUTH-EAST ELEVATION TO FACILITATE USE AS BOAT EXHIBITION OF BUILDING P (CONSERVATION AREA AND SCHEDULED MONUMENT)