Victory Arch London Waterloo Station Station Approach London SE1 8SW
Works to Victory Arch involving the removal of western brick elevation, re-facing of western elevation and lower southern elevations in Portland stone, replacement of windows to west elevation with steel framed windows including refurbishment of windows to the south elevation, relocation of fire exit to south elevation, relocation of 2 vents and 4 external HVAC units, fireproofing, relocation of soil pipes internally and installation of louvered plant screen to the roof, plus others associated works in association with the adjoining redevelopment of Elizabeth House. (Please note: The reference number for this Listed Building Consent application is 22/04141/LB but there is also an associated application for Full Planning Permission related to these works with reference number: 22/04140/FUL).
44 Stockwell Park Crescent London Lambeth SW9 0DG
Listed building Consent with respect to refurbishment of the original house roof, minor alterations and refurbishment to the interior of the original house, changes to the existing extension and fenestration, demolition of the existing conservatory and replacement with a ground floor flat roofed extension in matching facing brick with roof light and new openings. (Please note: The reference number for this Listed Building Consent application is 22/02300/LB but there is also an associated application for Full Planning Permission related to these works with reference number: 22/02299/FUL)
131 Waterloo Road SE1 8UR And The Old Vic 103 The Cut London SE1 8NB
Relocation of stage door, reconfiguration and refurbishment of various back of house areas at The Old Vic theatre, including rehearsal room, access ways, dressing rooms, staff offices, storage and WC facilities, openings in party wall. External lighting along Waterloo Road facade, fixings for signage and installation of plant screen at roof top level and associated works.
68 Vassall Road London SW9 6HY
Replacement windows, replacement lower ground side doors, relocation of a first floor side window, installation of an upper ground rear Juliette balcony, fenestration alteration to the upper ground rear windows at the part two storey extension, installation of one central rooflight at the main roof and one rooflight and renew front render to the part two storey extension; replacement front upper ground external light and York stone covering to front external steps together with works at: Lower ground floor: Reinstatement of two fireplaces, creation of a WC, Conversion of the rear bedroom into pantry and utility rooms, replacement heath, block one door, opening of two doorways, relocation of one door, replacement internal window, and installation of new cylinder/boiler under the external rear stair. Upper ground floor: Replacement living room and bathroom for an orangery and WC, enlarge corridor to form an entrance hall, insertion of a French doors connecting dining room and formal living room and removal of a WC, First floor: Replacement and enlargement of the internal stair, relocation of a bathroom, ensuite bathroom, enlargement of landing and bedroom, blocking up one doorway, reopening of two fireplace, installation of fix window into existing doorway, removal of laundry room, boiler and partition walls; reduction of two front bedrooms, and new side vent. Second floor: Formation of a WC and the removal of partition walls for an enlarge home office room and a new fireplace.